izpis_h1_title_alt

Določanje nihanja gladine Bohinjskega jezera : diplomska naloga
ID Erčulj, Andraž (Avtor), ID Ambrožič, Tomaž (Mentor) Več o mentorju... Povezava se odpre v novem oknu, ID Marjetič, Aleš (Komentor)

.pdfPDF - Predstavitvena datoteka, prenos (7,81 MB)
MD5: 1294AFBB2BE16D4F39387E7BCC358485

Izvleček
V okviru diplomske naloge smo določili nihanje gladine Bohinjskega jezera. Za to je bilo potrebno vzpostaviti nivelmansko mrežo. Mrežo smo navezali na reper, stabiliziran v mostu čez Jezernico. Višine novih reperjev smo določili z metodo geometričnega nivelmana. Po izmeri je sledila višinska izravnava po metodi najmanjših kvadratov. Višino gladine Bohinjskega jezera smo določili s pomočjo metode trigonometričnega višinomerstva in z uporabo »mareografa«. Pridobljene rezultate smo primerjali s podatki na vodomerni lati pri cerkvi Svetega Duha.

Jezik:Slovenski jezik
Ključne besede:geometrični nivelman, niveliranje, nivelmanska mreža, izravnava, reper, trigonometrično višinomerstvo, mareograf
Vrsta gradiva:Diplomsko delo/naloga
Tipologija:2.11 - Diplomsko delo
Organizacija:FGG - Fakulteta za gradbeništvo in geodezijo
Kraj izida:Ljubljana
Založnik:[A. Erčulj]
Leto izida:2021
PID:20.500.12556/RUL-130864 Povezava se odpre v novem oknu
UDK:528.021.4:556.552(497.4)(043.2)
COBISS.SI-ID:79181315 Povezava se odpre v novem oknu
Datum objave v RUL:18.09.2021
Število ogledov:855
Število prenosov:133
Metapodatki:XML RDF-CHPDL DC-XML DC-RDF
:
Kopiraj citat
Objavi na:Bookmark and Share

Sekundarni jezik

Jezik:Angleški jezik
Naslov:Determination of the Bohinj lakes surface height : graduation thesis
Izvleček:
As part of the graduation thesis, we determined the height of the Bohinj lakes surface. For that, we had to established a levelling network. The network was attached to the benchmark stabilised in the bridge over the river Jezernica. The method to determine the height of the new benchmarks was geometrical levelling. After the measurement of the geometrical levelling, came the height adjustment by the method of least squares. The height of the Bohinj lakes surface was measured with the trigonometric height measuring and with the help of a “tide gauge”. At the end, the results were compared to the tide staff at the church of Sveti Duh.

Ključne besede:geometrical levelling, levelling, levelling network, adjustment, benchmark, trigonometric height measuring, tide gauge

Podobna dela

Podobna dela v RUL:
Podobna dela v drugih slovenskih zbirkah:

Nazaj