izpis_h1_title_alt

Določanje nihanja gladine Bohinjskega jezera : diplomska naloga
ID Erčulj, Andraž (Author), ID Ambrožič, Tomaž (Mentor) More about this mentor... This link opens in a new window, ID Marjetič, Aleš (Comentor)

.pdfPDF - Presentation file, Download (7,81 MB)
MD5: 1294AFBB2BE16D4F39387E7BCC358485

Abstract
V okviru diplomske naloge smo določili nihanje gladine Bohinjskega jezera. Za to je bilo potrebno vzpostaviti nivelmansko mrežo. Mrežo smo navezali na reper, stabiliziran v mostu čez Jezernico. Višine novih reperjev smo določili z metodo geometričnega nivelmana. Po izmeri je sledila višinska izravnava po metodi najmanjših kvadratov. Višino gladine Bohinjskega jezera smo določili s pomočjo metode trigonometričnega višinomerstva in z uporabo »mareografa«. Pridobljene rezultate smo primerjali s podatki na vodomerni lati pri cerkvi Svetega Duha.

Language:Slovenian
Keywords:geometrični nivelman, niveliranje, nivelmanska mreža, izravnava, reper, trigonometrično višinomerstvo, mareograf
Work type:Bachelor thesis/paper
Typology:2.11 - Undergraduate Thesis
Organization:FGG - Faculty of Civil and Geodetic Engineering
Place of publishing:Ljubljana
Publisher:[A. Erčulj]
Year:2021
PID:20.500.12556/RUL-130864 This link opens in a new window
UDC:528.021.4:556.552(497.4)(043.2)
COBISS.SI-ID:79181315 This link opens in a new window
Publication date in RUL:18.09.2021
Views:1249
Downloads:161
Metadata:XML DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Determination of the Bohinj lakes surface height : graduation thesis
Abstract:
As part of the graduation thesis, we determined the height of the Bohinj lakes surface. For that, we had to established a levelling network. The network was attached to the benchmark stabilised in the bridge over the river Jezernica. The method to determine the height of the new benchmarks was geometrical levelling. After the measurement of the geometrical levelling, came the height adjustment by the method of least squares. The height of the Bohinj lakes surface was measured with the trigonometric height measuring and with the help of a “tide gauge”. At the end, the results were compared to the tide staff at the church of Sveti Duh.

Keywords:geometrical levelling, levelling, levelling network, adjustment, benchmark, trigonometric height measuring, tide gauge

Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Back