izpis_h1_title_alt

IZVEDBA PROJEKTA VGRADNJE TRANSFORMATORJA 400/110 kV V RTP PODLOG
ID GRUDEN, LUKA (Avtor), ID Ažbe, Valentin (Mentor) Več o mentorju... Povezava se odpre v novem oknu

.pdfPDF - Predstavitvena datoteka, prenos (1,00 MB)
MD5: CF7088CCC8E81A2E46CE4B62CD3A7D66

Izvleček
Prenos električne energije je pomemben dejavnik za nemoteno delovanje gospodarstva in tudi za posamezna gospodinjstva. Da pa se električna energija lahko prenese do končnega uporabnika, je potrebna vmesna transformacija. Transformacije se izvedejo v razdelilnih transformatorskih postajah. V diplomski nalogi so predstavljeni RTP Podlog, njegova obnova in vsi nadaljnji postopki do zagona novega transformatorja 400/110 kV 300 MVA, kar je tudi cilj diplomskega dela. Predstavljene so tudi različne možnosti za prenovo RTP Podlog. Glede varnosti obratovanja je bila najprimernejša ta, da se stari transformator 220/110 kV zamenja z novim 400/110 kV. Zamenjava je bila upravičena zaradi dotrajanosti starega in ker se napetostni nivo 220 kV postopno ukinja.

Jezik:Slovenski jezik
Ključne besede:elektroenergetski sistem, prenos električne energije, transformator, razdelilna transformatorska postaja
Vrsta gradiva:Diplomsko delo/naloga
Organizacija:FE - Fakulteta za elektrotehniko
Leto izida:2020
PID:20.500.12556/RUL-119128 Povezava se odpre v novem oknu
Datum objave v RUL:03.09.2020
Število ogledov:9446
Število prenosov:230
Metapodatki:XML DC-XML DC-RDF
:
Kopiraj citat
Objavi na:Bookmark and Share

Sekundarni jezik

Jezik:Angleški jezik
Naslov:PROJECT IMPLEMENTATION OF 400/110 kV TRANSFORMER INSTALLATION IN RTP PODLOG
Izvleček:
The economy and electric energy consumers are highly dependent on reliable electric energy transmission. The transmission of electric energy starts from generation units towards end consumers over transmission lines. On the generation side, the generator voltage is transformed into a higher voltage. Electicity is then transmitted over transmission lines over long distances to transformer substations, where the voltage is transformed to lower voltage values. This work presents the Podlog substation, its renovation and all further phases up to commissioning of the new 400/110 kV 300 MVA transformer, which is also the goal of this work. Various variants for the renovation of Podlog substation are also presented. From the point of view of operational reliability, it was most appropriate to replace the old transformator with a new one. Replacement of the 220/110 kV transformer with a new 400/110 kV transformer was necessary due to operational condition and cancellation of 220 kV voltage level.

Ključne besede:electric power system, transmission of electric energy, transformer, transformer substation

Podobna dela

Podobna dela v RUL:
Podobna dela v drugih slovenskih zbirkah:

Nazaj