The master's thesis covers the design of a 20/0,4 kV distribution transformer substation, a
20 kV connection cable, and the reconstruction of the low-voltage network. As part of the master's thesis, the existing distribution network in the area of Bled was analysed, based on which a technical justification for the installation of a new distribution transformer substation was provided. The layout of the proposed new distribution network and the operating scheme were presented. The new distribution transformer substation and its main components, including the transformer and transformer protection, MV switchgear and LV switchboard, are described in detail. Calculations were carried out to determine the appropriate rated power of the transformer based on the expected peak load of the consumers. Based on the analysis of the network, the components of the MV switchgear and LV switchboard were selected, and appropriate cable connections between the transformer and the MV switchgear or LV switchboard were determined. The new 20 kV connection cable was also presented, for which the appropriate cable cross-section was determined, as well as the elements for the reconstruction of the low-voltage network, for which the appropriate low-voltage cable cross-sections and electrical distribution cabinets were determined based on the expected new loads. The installation of cable ducts, cable manholes and cable trenches required for the reconstruction of the distribution network was described in detail. Short-circuit calculations were performed to analyse the short-circuit conditions in the considered part of the network, the selectivity of the protection devices was verified, and their settings were determined. To ensure the operational safety of the new distribution transformer substation, the earthing system and lightning protection system were also addressed. The expected total earthing resistance of the transformer substation earthing system was calculated. Due to the excessively high value, the required amount of material for reducing the earthing resistance was determined and added to the earthing ring around the transformer substation. The earthing arrangement of the transformer substation enclosure and equipment was determined and graphically presented. Finally, for the purpose of lightning protection, the lightning density in the area of the proposed transformer substation was determined and appropriate lightning protection of the structure was considered.
|