and industrial buildings have recently led to rapid developments in the field of building
automation. The climatic conditions in production facilities are important for the we l-being
and health of employees as wel as for meeting the production requirements. The thesis
deals with the design and construction of a control system for heating, ventilation and air
conditioning (HVAC) for pharmaceutical industry. A control system must be developed.
Furthermore, a SCADA system must be implemented to alow efficient management of the
system a suitable human-machine interface (HMI).
|