The diploma thesis discusses the placement of work places in a new facility for the shading production. The introduction presents theoretical basics of production planning, material flow analysis, and a description of internal transport and costs. In the theory is described also the Schmigalla modified triangle method, according to which placement of work places in a new facility is carried out in the software program VisTABLE. Based on this method the workplaces are positioned to follow the optimal material flow of the product. Transport routes that connect individual work places are short and direct. According to this method, transport costs are 36 % lower and transport routes 39 % shorter compared to the existing facility.
|