V diplomski nalogi obravnavamo problematiko zagonov večjih parnih postrojenj. Zaradi velikih mas postrojenja in posledično velike termične vztrajnosti je potrebno hladne zagone parnih postrojenj izvajati po določenih in standardiziranih postopkih segrevanja z zagonsko paro. V obravnavanem primeru zagotavljamo zagonsko paro z utilizatorjem, ki je prigrajen odprtemu plinskemu procesu. V nalogi smo predstavili merilne metode in postopek izvedbe prevzemnih meritev ter analizirali izmerjene vrednosti masnih in energijskih tokov na robovih utilizatorja in jih primerjali z numerično izračunanimi. Rezultati meritev se ujemajo z rezultati numeričnega modela. Izkaže se, da prevzemne meritve potrdijo pogodbo zajamčene tehnološke vrednosti zagonske pare.

Language:Slovenian
Keywords:parna postrojenja zagon parnih postrojenj utilizator plinsko-parni proces zagonska para prevzemne meritve
Work type:Bachelor thesis/paper
Organization:FS - Faculty of Mechanical Engineering
Year:2017
PID:20.500.12556/RUL-95466 This link opens in a new window
Publication date in RUL:20.09.2017
Views:2569
Downloads:458
Metadata:XML RDF-CHPDL DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:HRSG for cold start-up of steam power plants
Abstract:
In this diploma thesis, we deal with issues about cold start-ups of larger steam power plants. Due to a great mass of the power plant and consequently greater thermal perseverance cold start-ups must be executed explicitly by certain standardized procedures. In considered case start-up steam is produced with HRSG which is attached to the gas turbine. In written assignment, we introduced measurement methods with procedures defining how to carry out the takeover measurements. We also analysed measured quantities of mass and energy currents on the edge of HRSG system and compared them with numerically computed quantities. The outcome of measurements matches with the results of numerical model which validates guarantee-contract of technological start-up steam parameters.

Keywords:Steam power plants Cold start-up of steam power plants HRSG Gas-steam process Start-up steam Takeover measurements