izpis_h1_title_alt

Utilizator za proizvodnjo zagonske pare parnih postrojenj
ID Strgulec, Oton (Avtor), ID Sekavčnik, Mihael (Mentor) Več o mentorju... Povezava se odpre v novem oknu

.pdfPDF - Predstavitvena datoteka, prenos (2,47 MB)
MD5: 70483F019E407162D5DE04B9DF6DBBC2
PID: 20.500.12556/rul/cc153644-f9cb-4c90-be92-7eec856bec8b

Izvleček
V diplomski nalogi obravnavamo problematiko zagonov večjih parnih postrojenj. Zaradi velikih mas postrojenja in posledično velike termične vztrajnosti je potrebno hladne zagone parnih postrojenj izvajati po določenih in standardiziranih postopkih segrevanja z zagonsko paro. V obravnavanem primeru zagotavljamo zagonsko paro z utilizatorjem, ki je prigrajen odprtemu plinskemu procesu. V nalogi smo predstavili merilne metode in postopek izvedbe prevzemnih meritev ter analizirali izmerjene vrednosti masnih in energijskih tokov na robovih utilizatorja in jih primerjali z numerično izračunanimi. Rezultati meritev se ujemajo z rezultati numeričnega modela. Izkaže se, da prevzemne meritve potrdijo pogodbo zajamčene tehnološke vrednosti zagonske pare.

Jezik:Slovenski jezik
Ključne besede:parna postrojenja zagon parnih postrojenj utilizator plinsko-parni proces zagonska para prevzemne meritve
Vrsta gradiva:Diplomsko delo/naloga
Organizacija:FS - Fakulteta za strojništvo
Leto izida:2017
PID:20.500.12556/RUL-95466 Povezava se odpre v novem oknu
Datum objave v RUL:20.09.2017
Število ogledov:3379
Število prenosov:492
Metapodatki:XML DC-XML DC-RDF
:
Kopiraj citat
Objavi na:Bookmark and Share

Sekundarni jezik

Jezik:Angleški jezik
Naslov:HRSG for cold start-up of steam power plants
Izvleček:
In this diploma thesis, we deal with issues about cold start-ups of larger steam power plants. Due to a great mass of the power plant and consequently greater thermal perseverance cold start-ups must be executed explicitly by certain standardized procedures. In considered case start-up steam is produced with HRSG which is attached to the gas turbine. In written assignment, we introduced measurement methods with procedures defining how to carry out the takeover measurements. We also analysed measured quantities of mass and energy currents on the edge of HRSG system and compared them with numerically computed quantities. The outcome of measurements matches with the results of numerical model which validates guarantee-contract of technological start-up steam parameters.

Ključne besede:Steam power plants Cold start-up of steam power plants HRSG Gas-steam process Start-up steam Takeover measurements