izpis_h1_title_alt

Preureditev montažne celice za izdelavo elektromotorjev
ID Piculin, Luka (Author), ID Kušar, Janez (Mentor) More about this mentor... This link opens in a new window, ID Berlec, Tomaž (Co-mentor)

.pdfPDF - Presentation file, Download (4,98 MB)
MD5: 6196EFA93EC14A6649342689D829BC22
PID: 20.500.12556/rul/98a1cf5b-3c12-4cd2-9752-c167ca63e343
.pdfPDF - Appendix, Download (673,28 KB)
MD5: E6D5035EAE81AED41EC37804064B1310
PID: 20.500.12556/rul/ba42c4fb-0464-4930-9af9-bf299839342d

Abstract
Podjetje se je odločilo, da bo zaradi izdelave novega izdelka nadgradilo obstoječo montažno celico. V nalogi smo analizirali obstoječi proces montaže elektromotorjev in definirali njegove šibke točke. Ideje za izboljšave, pridobljene z brainstormingom, smo z analizo koristnosti ovrednotili in izbrali najboljše rešitve. Z dodatnimi napravami smo omogočili proces izdelave novega tipa elektromotorja. S preureditvijo celice iz L-oblike v O-celico in z balansiranjem operacij smo znižali čas takta. Znižali smo tudi izgube, ki se posredno navezujejo na montažo, in s tem zvišali skupno učinkovitost procesa. Z novo kontrolno napravo in uvedbo sledljivosti smo dvignili kakovost izdelkov. Ekonomsko upravičenost investicije smo preverili s statičnimi in dinamičnimi metodami investicijskega računa.

Language:Slovenian
Keywords:vitka proizvodnja prostorska razmestitev delovnih sredstev celična proizvodnja generiranje in vrednotenje idej študij dela uravnoteženje celice investicijski izračun
Work type:Master's thesis/paper
Organization:FS - Faculty of Mechanical Engineering
Year:2017
PID:20.500.12556/RUL-92955 This link opens in a new window
Publication date in RUL:11.07.2017
Views:1377
Downloads:568
Metadata:XML RDF-CHPDL DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Upgrading assembly cells for the manufacture of the electric motor
Abstract:
The company decided to upgrade existing assembly cell in order to manufacture a new product. In this master’s thesis, we analyzed the existing process of assembly the electric motors and define its weak points. Ideas for improvements, gained with brainstorming, has been evaluated with utility analysis and the best solutions have been selected. With the use of additional devices, we enabled the process of manufacturing new type of electric motor. By rearranging the cells from L shape to the O-cell and balancing the operations, we reduced cycle time. We have reduced the losses, which are not directly related to the assembly and thereby increased the overall efficiency of the process. With the new control device and with the introduction of traceability, we have raised the quality of products. The economic viability of the investment was carried out with static and dynamic methods of investment account.

Keywords:lean production spatial distribution of working assets cell production generating and evaluating ideas work study cells balancing investment calculation

Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Back