My thesis studies the intersection in Jurjevica village, which is not constructed very well at the moment. I also research a possible bypass freight route between Jurjevica and two quarries that would avoid Kot pri Ribnici village. At first I describe the existing intersection and the road, which currently leads to the quarries. Then I calculate the traffic loads, acquired by traffic count, and introduce a
theoretical basis for the design of junctions and roundabouts. I present three different methods of
reconstruction for the intersection. The first one is a rearrangement of the intersection with an introduction of the left turn lane. The second one is the rearrangement of the intersection into roundabout and the third one the rearrangement of the intersection into roundabout with bypass. For the second and third method I also check the level of traffic loads at the Austrian method. Then I
present the bypass freight route between Jurjevica and quarries. In the end of my thesis the annexes with all rearrangement variants of the intersection and the plan of the bypass freight route are given.
|