Vaš brskalnik ne omogoča JavaScript!
JavaScript je nujen za pravilno delovanje teh spletnih strani. Omogočite JavaScript ali pa uporabite sodobnejši brskalnik.
Repozitorij Univerze v Ljubljani
Nacionalni portal odprte znanosti
Odprta znanost
DiKUL
slv
|
eng
Iskanje
Brskanje
Novo v RUL
Kaj je RUL
V številkah
Pomoč
Prijava
Podrobno
Kratkoročno planiranje proizvodnih kapacitet ob sočasnem razvrščanju proizvodnje
ID
SIMIKJ, EMILIJA
(
Avtor
),
ID
Mušič, Gašper
(
Mentor
)
Več o mentorju...
PDF - Predstavitvena datoteka,
prenos
(1,06 MB)
MD5: 6858A08FD1FD5E2FE2EDE485528C2730
PID:
20.500.12556/rul/d536047c-fef0-4da9-8161-0b395556d2d3
Galerija slik
Izvleček
Obstaja velika konkurenčnost med podjetji v proizvodnem okolju. Glavni cilji podtjetja so izboljšava strankinega odzivnega časa, povečava ponudbe izdelkov in storitev, upravljanje z variabilnih povpraševanj z ene strani, z druge pa cenovna konkurenčnost. Podjetja so osredotočena na zmanješevanjem stroškov vodenja ter na optimizacijo uporabe razpoložljvih virov. Glavno vprašanje je kako zmanjšati skupne stroške in povečati profita ter vzdržiti odzivnost strank. Predmet te naloge je opazovanje potencialnih koristi proizvodnega planiranja in razvrščanja v proizvodni industriji z uporabo matematičnih modelov, ko imamo kratko odbobje planiranja. Cilj je raziskati prednosti ter koristi proizvodnega planiranja in razvrščanja v kompleksnem proizvodnem okolju. Uporabljeni matematični modeli kot rešitev dajejo istočasno planiranje kapacitete in optimalno razvrščanje v poljubno število proivodnih celic po izmenah z uvedbo nadurnega dela. V tej nalogi se poudarja sam problem proizvodnega planiranja in razvrščanja, pogled v teoretično ozadje te raziskave ter pregled matamatičnih modelov. Obravnavan je praktičan primer planiranja in razvrščanja, za katerega so podani seznam možnih rešitev, opis implementacije rešitve in analiza rezultatov.
Jezik:
Slovenski jezik
Ključne besede:
proizvodno planiranje
,
proizvodno razvrščanje
,
matematični modeli
Vrsta gradiva:
Magistrsko delo/naloga
Organizacija:
FE - Fakulteta za elektrotehniko
Leto izida:
2016
PID:
20.500.12556/RUL-84525
Datum objave v RUL:
29.08.2016
Število ogledov:
3080
Število prenosov:
316
Metapodatki:
Citiraj gradivo
Navadno besedilo
BibTeX
EndNote XML
EndNote/Refer
RIS
ABNT
ACM Ref
AMA
APA
Chicago 17th Author-Date
Harvard
IEEE
ISO 690
MLA
Vancouver
:
SIMIKJ, EMILIJA, 2016,
Kratkoročno planiranje proizvodnih kapacitet ob sočasnem razvrščanju proizvodnje
[na spletu]. Magistrsko delo. [Dostopano 1 april 2025]. Pridobljeno s: https://repozitorij.uni-lj.si/IzpisGradiva.php?lang=slv&id=84525
Kopiraj citat
Objavi na:
Sekundarni jezik
Jezik:
Angleški jezik
Naslov:
Simultaneous short-term production capacity planning and production scheduling
Izvleček:
Nowadays, there is high competitiveness between companies in the manufacturing environment. Companies' main goals are better customer response time, better demand variability management, increased product and service offerings on the one hand and price competitiveness on the other hand. Companies are focused on reducing operational costs and optimal resource usage. The main question is how to find the right balance between cutting total costs and maintaining customer responsiveness. This master thesis' subject is researching the potential advantages of industrial planning and scheduling in industrial environment using mathematical models when we have short planning horizon. The aim is to research the advantages and disadvantages of industrial planning and scheduling in complex manufacturing environment. Mathematical models, that are being used in this master thesis, provide capacity planning and optimal scheduling at the same time as solution. A solution is given when we are having different number of production cells, workers, that are working in shifts and we assume overtime work. In this master thesis is emphasized the problem of industrial planning and scheduling, as well as the theoretical overview of different mathematical models. Also, a practical example of planning and scheduling is being addressed and studied. A set of possible solutions, description of the solution implementation, as well as analysis of the results are given in this thesis.
Ključne besede:
industrial planning
,
scheduling
,
mathematical models
Podobna dela
Podobna dela v RUL:
Analysis of 2D structures using finite element method
Analysis of 3D structures using finite element method
Modal analysis of three-dimensional truss structures using the finite element method
Analysis of stress concentrations in climbing ropes using finite element method
Dynamics analysis of uniaxial structures using the finite element method
Podobna dela v drugih slovenskih zbirkah:
Application for response analysis of truss structures by using FEM
Planar truss optimization using genetic algorithms
Design of the permanent magnet synchronous motor using the finite element method
Electromagnetic field analysis of standard and compact transmission lines tower by using finite element method
CALCULATION OF TEMPERATURE DISTRIBUTION IN THREE-PHASE INDUCTION MOTOR BY USING FINITE ELEMENT METHOD
Nazaj