Povzetek V diplomski nalogi je narejen izračun komponent za oblikovanje 110 kV daljnovoda, ki prečka nedostopno mesto. Izračun za dodatno zimsko breme smo naredili dvakrat za isti primer daljnovoda. Prvič smo upoštevali, da je faktor za dodatno zimsko breme 1, v drugem primeru pa da je faktor 2,5. V prvem primeru izračun zadostuje predpisom starega pravilnika za graditev nadzemnih elektroenergetskih vodov z napetostjo od 1 kV do 400 kV, v drugem primeru pa izračun zadostuje standardom SIST EN 50341, slednji je skupaj s standardom SIST EN 50423 nadomestil star pravilnik. Višino stebrov smo najprej določili grafično s pomočjo krivulj, nato pa še računsko. Dobljene rezultate smo med seboj primerjali. Predpisani varnostni višini hV za isto območje (nedostopen teren) se v pravilniku in standardu razlikujeta. Nov standard glede na napetostni nivo omrežja poleg varnostnih višin uvaja tudi cone. Slovenija je razdeljena na tri vetrne in tri žledne cone. Tako lahko nek nadzemni vod prečka dve coni ali pa kar vse tri, zato moramo biti pazljivi in vod razdeliti v odseke glede na cone. Star pravilnik loči med normalnimi obtežbami in izrednimi obtežbami. Standard pa loči stalne in spremenljive obtežbe. Bistvene spremembe so torej pri uvedbi novih kombinacij obtežb. S pomočjo izračunov smo želeli ugotoviti razliko med povesi, nateznimi napetostmi vrvi in določiti višine stebrov glede na različni faktor žledne obtežbe.

Language:Slovenian
Keywords:Ključne besede: dodatno zimsko breme, spremenljive obtežbe, poves, natezna napetost, varnostna višina, višina stebrov.
Work type:Undergraduate thesis
Organization:FE - Faculty of Electrical Engineering
Year:2016
PID:20.500.12556/RUL-83506 This link opens in a new window
Publication date in RUL:16.06.2016
Views:2555
Downloads:454
Metadata:XML DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Design of overhead power line taking into account increased winter load
Abstract:
Abstract In diploma we made a calculation of components for formation of 110 kV power line, that cross the inaccessible area. We made the calculation for additional winter burden twice. Firstly, we considered that the factor for the additional winter burden is 1, and secondly, 2,5. In first option the calculation is sufficient for the regulations of the old list of rules for constructing the above ground electro-energetic lines with voltage from 1 kV to 400 kV. In second option the calculation is sufficient for standards of SIST EN 50341, which together with standard SIST EN 50423 substituted the old list of rules. The height of pillars we firstly determined graphically with curves and then also computional. Then we also compared the results. The mandatory security heights hV for the same area (inaccessible area) are different in list of rules and standards. The new standard of the voltage level of the network besides security heights, mention also the zones. Slovenia is divided into three wind and three sleet zones. One above ground line can cross two zones or all three and this is why we have to be carefull and divide the line into sections, regarding to zones. The old list of rules divides normal overloads and exceptional. The standard divides permanent and variable overloads. With calculations we wanted to establish the difference between the hang, tension of the rope and define the height of pillars considering the diffetent factor of sleet overload.

Keywords:Key words: additional winter burden, variable overloads, hang, tension, security height, height of pillars.