In this thesis, I have analysed the section of a local road, which connects the city Grosuplje with the village Ponova vas. The thesis contains a description of the current status and possible technical solutions. I have obtained information about fluidity pressures of the intersection by manual counting of traffic, than I have calculated fluidity pressures of the roundabout. I have replaced the existing π intersection with the roundabout. On the whole route, lanes should be expanded to 2.75 m. The entire route contains reconstructed pedestrian walkway along the left edge of the carriageway, roadside lighting, and drains to drain rainwater. I have placed two bus stops and two bus waiting places with a roof on each side of the roadway.
Given the level of alignment in the horizontal plane, a road permits higher speeds than the permissible. Therefore, I have put traffic-calming measures with the splitter island on a flat route section. The entire route has got traffic signs and markings on the road.
|