This Graduation Thesis represents entire spectrum of geodetic surveying that is necessary before, during and after the implementation of the sewerage network. Along with the geodetic surveying, the key project documentation for the implementation of the project is presented. In the first phase, the required documentation and the necessary geodetic surveying to start construction are presented. Further below the required documentation for the execution of construction work is outlined. That represents the second phase. Completion of the construction of the sewerage system is followed by geodetic surveying required to obtain operating licence.
|