On the Slovenian national road network a total of 15 bridges have a weight limit restriction due to their poor condition. Their condition is a result of cuts in funding of remedial works in recent years; consequently already planned remedial works were not undertaken. To remedy the problem rehabilitation of these bridges needs to be performed.
Construction industry is a typical business activity and one of the key indicators of state investment in infrastructure. The construction of most structures represents the extensive and complex range of activities. The problem is reflected in the management of information,
which increases with the size and number of projects. Construction companies use different IT tools that facilitate their planning and monitoring of the construction processes which may result in bad connectivity between different tools used. The result is a lack of transparency of information, inability to automate data transfer, questionable quality and safety of data.
In the first part of the thesis general problems related to damage of bridges and the importance of their assessment and remediation are presented. Based on the actual case (Dolsko bridge) the description of common types of damages and a proposal for remedial action are discussed. The second part of the thesis presents the preparation of the project bill of quantities as a tender documentation. Preparation includes: project scope definition as work breakdown structure (WBS) and location of the course. Structured bill of quantities is prepared using Xpert project management tool and exported to MS Project. In collaboration with the designers, a locational course of execution of works, which serves as an aid in the production of accurate schedule was created.
|