Izgradnja 110 kV s plinom izoliranega stikališča v HE Formin
ID KOŽELJ, TILEN (Author), ID Ažbe, Valentin (Mentor) More about this mentor... This link opens in a new window

.pdfPDF - Presentation file, Download (17,29 MB)
MD5: 8CDE0752718B07A13B3EAD1B7CD9230F

Abstract
Obnova HE Formin je ločena na dva dela, prvi se nanaša na obnovo dovodnega kanala in strojnico elektrarne, drugi pa na prenovo stikališča. Diplomska naloga je osredotočena na izgradnjo 110 kV stikališča Formin v izvedbi GIS ter vzdrževanje in obratovanje tipov stikališč GIS. Izgradnja novega stikališča je potrebna, ker je staro 110 kV tehnološko zastarelo. Obstoječa primarna oprema je dotrajana, sekundarna oprema pa večinoma ne ustreza sodobnim zahtevam predvsem glede vodenja in zaščite tovrstnih objektov. V diplomski nalogi utemeljimo tudi izbiro stikališča tipa GIS.

Language:Slovenian
Keywords:Obnova, stikališče, GIS, hidroelektrarna (HE), vzdrževanje.
Work type:Bachelor thesis/paper
Typology:2.11 - Undergraduate Thesis
Organization:FE - Faculty of Electrical Engineering
Year:2024
PID:20.500.12556/RUL-161474 This link opens in a new window
COBISS.SI-ID:207248131 This link opens in a new window
Publication date in RUL:11.09.2024
Views:213
Downloads:65
Metadata:XML DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Construction of 110 kV gas insulated substation in HPP Formin
Abstract:
The renovation of the Formin HPP is divided into two parts, the first relates to the renovation of the supply channel and the power plant’s engine room, and the second to the renovation of the switchyard. The diploma thesis will focus on the construction of the 110 kV Formin switchgear in GIS implementation and mainte- nance and operation of GIS switchgear types. However, the construction of a new switchyard is necessary because the old 110 kV is technologically obsolete. The existing primary equipment is worn-out, and the secondary equipment mostly does not meet modern requirements, especially in terms of control and protec- tion of such facilities. Throughout the diploma thesis, the choice of a GIS-type switchgear is also justified.

Keywords:Reconstruction, switchyard, GIS, Hydro power plant (HPP), main- tenance.