V diplomskem delu smo predstavili racionalizacijo proizvodnega procesa v podjetju, ki se ukvarja z navtično opremo. Pri raziskavi smo se zgledovali po Toyotinem proizvodnem sistemu in tako pri delu uporabili različne metode in orodja vitke proizvodnje. Analizirali smo trenutno stanje ter določili glavne vzroke izgubljenega časa, predlagali izboljšave, nekatere uvedli in na ponavljajočem se projektu primerjali rezultate. Ugotovili smo, da se je stanje v podjetju po uvedbi dveh sprememb izboljšalo, predvsem v proizvodnem delu procesa. To je potrdilo naše mnenje, da je racionalizacija proizvodnega procesa v podjetju potrebna, smiselna in koristna.

Jezik:Slovenski jezik
Ključne besede:racionalizacija, vitka proizvodnja, Toyotin proizvodni sistem, izgubljeni čas
Vrsta gradiva:Diplomsko delo/naloga
Tipologija:2.11 - Diplomsko delo
Organizacija:BF - Biotehniška fakulteta
Kraj izida:Ljubljana
Založnik:[A. Arh]
Leto izida:2021
PID:20.500.12556/RUL-129988 Povezava se odpre v novem oknu
UDK:658.51:684:629.5
COBISS.SI-ID:75496963 Povezava se odpre v novem oknu
Datum objave v RUL:10.09.2021
Število ogledov:2638
Število prenosov:154
Metapodatki:XML DC-XML DC-RDF
:
ARH, Anamarija, 2021, Racionalizacija proizvodnega procesa v podjetju Metalika d.o.o. [na spletu]. Diplomsko delo. Ljubljana : A. Arh. [Dostopano 30 marec 2025]. Pridobljeno s: https://repozitorij.uni-lj.si/IzpisGradiva.php?lang=slv&id=129988
Kopiraj citat
Objavi na:Bookmark and Share

Sekundarni jezik

Jezik:Angleški jezik
Naslov:Rationalization of the production process in the company Metalika d.o.o.
Izvleček:
In the thesis we presented the rationalization of the production process in a company that produces furniture for ships and yachts. As a good example we used the Japanese firm Toyota and their Toyota production system. To perform the rationalization we used different methods and tools of lean manufacturing. We have analysed the current state of the company, determined the main sources of lost time, suggested improvements, some of which we introduced to the process, and compared the results based on a project that has been carried out several times. We found that the state of the company improved, especially in the production part of the process, after implementing two changes. That confirmed our opinion that rationalization of the production process in the company is needed, logical and beneficial.

Ključne besede:rationalization, lean manufacturing, Toyota production system, lost time

Podobna dela

Podobna dela v RUL:
  1. Dinamika prostorskih linijskih elementov z interpolacijo deformacijskih količin
  2. Analiza novega hladilnega stolpa v Šoštanju na vpliv vetra
  3. Finite element analysis of limit load and localized failure of structures
  4. Mehanska in požarna analiza kompozitnih nosilcev
  5. Inženirske konstrukcije iz lepljenega lameliranega lesa v Sloveniji
Podobna dela v drugih slovenskih zbirkah:
  1. Optimizacija temeljne plošče
  2. Konstrukcija nosilca antene NAPS
  3. Projektiranje AB kontinuirnega nosilca
  4. Tehnologija proizvodnje in montaže prednapetih votlih plošč
  5. Montažna AB hala s primarnim nosilcem spremenljivega prereza

Nazaj