izpis_h1_title_alt

Izvajanje monitoringa po opustitvi rudarskih del
ID Hribar, Tomaž (Avtor), ID Vižintin, Goran (Mentor) Več o mentorju... Povezava se odpre v novem oknu

.pdfPDF - Predstavitvena datoteka, prenos (3,58 MB)
MD5: 149F027EB6B356FB5623D6053457E059

Izvleček
Po opustitvi rudarskih del in trajnem zaprtju rudnika mora nosilec rudarske pravice skladno z veljavno zakonodajo in v nadzorovanja pridobivalnega prostora izvajati monitoring. Monitoring obsega spremljavo sprememb, ki so nastale ob izvajanju rudarskih del, tako na površini kot pod njo. V nalogi so predstavljena izhodišča za izdelavo programa monitoringa po opustitvi rudarskih del. Pridobivanje mineralne surovine v podzemnem rudniku ima za posledico različne vplive na površino in podzemni prostor. Področja oziroma segmenti monitoringa so v nalogi razdeljeni v dva dela. Jamski del spremljave, obsega spremljavo geomehanskih, klimatskih in hidrogeoloških sprememb. Podobno je potrebno predvideti spremljavo dogajanj na površini, kjer je posebna pozornost posvečena stabilnostnim razmeram površine nad jamskimi deli in hidrogeološkim razmeram v območju pridobivalnega prostora oziroma vplivnem območju. Magistrsko delo predstavlja praktičen prikaz programa monitoringa, ki ga je potrebno izdelati ob zaprtju rudnika. V programu so zajeta področja, predstavljeni načini in metode meritev, kot tudi poročanje o le teh. Prav tako je predstavljen postopek analize že obstoječih meritev, ki jih je potrebno vključevati v izdelavo programa monitoringa. V zaključku naloge je predstavljen povzetek programa monitoringa, ki ga je potrebno izvajati ob opuščanju oziroma po opustitvi rudarskih del.

Jezik:Slovenski jezik
Ključne besede:Monitoring, površina, jamski del, stabilnost, pridobivalni prostor, metoda meritev, program spremembe, rudarsko delo
Vrsta gradiva:Magistrsko delo/naloga
Organizacija:NTF - Naravoslovnotehniška fakulteta
Leto izida:2021
PID:20.500.12556/RUL-124530 Povezava se odpre v novem oknu
COBISS.SI-ID:50079491 Povezava se odpre v novem oknu
Datum objave v RUL:29.01.2021
Število ogledov:1044
Število prenosov:131
Metapodatki:XML DC-XML DC-RDF
:
Kopiraj citat
Objavi na:Bookmark and Share

Sekundarni jezik

Jezik:Angleški jezik
Naslov:Monitoring of abandoned mine
Izvleček:
After the mining works on a mine are finished and the mine is permanently closed, the holder of the mining right must carry out monitoring in area of old mine works, in accordance with the applicable legislation and to control the extraction area. Monitoring includes the monitoring of changes that have occurred during the execution of mining works, both on the surface and below it. The paper presents the starting points for the preparation of a monitoring program after the mining works were finished. The extraction of mineral raw material in an underground mine results in various impacts on the surface and underground space. Areas or segments of monitoring are divided into two parts in this thesis. The cave part of the monitoring includes the monitoring of geomechanical, climatic and hydrogeological changes. Similarly, it is necessary to provide for the monitoring on the surface, where special attention is paid to the stability conditions of the surface above old mine works and the hydrogeological conditions in the area of the extraction area or the impact area. The master's thesis is a practical presentation of the monitoring program that needs to be developed when the mine is closed. The program covers areas, presents methods and methods of measurements, as well as reporting of them. Analysis of already existing measurements, which need to be included in the preparation of the monitoring program are also presented. In conclusion of the thesis, a summary of the monitoring program is presented, which must be carried out in case of finishing mining works or after the mining works are finished.

Ključne besede:Monitoring, area, cave part, stability, extraction area, measurement method, change program, mining work

Podobna dela

Podobna dela v RUL:
Podobna dela v drugih slovenskih zbirkah:

Nazaj