izpis_h1_title_alt

IZVEDBA PROJEKTA VGRADNJE TRANSFORMATORJA 400/110 kV V RTP PODLOG
ID GRUDEN, LUKA (Author), ID Ažbe, Valentin (Mentor) More about this mentor... This link opens in a new window

.pdfPDF - Presentation file, Download (1,00 MB)
MD5: CF7088CCC8E81A2E46CE4B62CD3A7D66

Abstract
Prenos električne energije je pomemben dejavnik za nemoteno delovanje gospodarstva in tudi za posamezna gospodinjstva. Da pa se električna energija lahko prenese do končnega uporabnika, je potrebna vmesna transformacija. Transformacije se izvedejo v razdelilnih transformatorskih postajah. V diplomski nalogi so predstavljeni RTP Podlog, njegova obnova in vsi nadaljnji postopki do zagona novega transformatorja 400/110 kV 300 MVA, kar je tudi cilj diplomskega dela. Predstavljene so tudi različne možnosti za prenovo RTP Podlog. Glede varnosti obratovanja je bila najprimernejša ta, da se stari transformator 220/110 kV zamenja z novim 400/110 kV. Zamenjava je bila upravičena zaradi dotrajanosti starega in ker se napetostni nivo 220 kV postopno ukinja.

Language:Slovenian
Keywords:elektroenergetski sistem, prenos električne energije, transformator, razdelilna transformatorska postaja
Work type:Bachelor thesis/paper
Organization:FE - Faculty of Electrical Engineering
Year:2020
PID:20.500.12556/RUL-119128 This link opens in a new window
Publication date in RUL:03.09.2020
Views:7719
Downloads:192
Metadata:XML RDF-CHPDL DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:PROJECT IMPLEMENTATION OF 400/110 kV TRANSFORMER INSTALLATION IN RTP PODLOG
Abstract:
The economy and electric energy consumers are highly dependent on reliable electric energy transmission. The transmission of electric energy starts from generation units towards end consumers over transmission lines. On the generation side, the generator voltage is transformed into a higher voltage. Electicity is then transmitted over transmission lines over long distances to transformer substations, where the voltage is transformed to lower voltage values. This work presents the Podlog substation, its renovation and all further phases up to commissioning of the new 400/110 kV 300 MVA transformer, which is also the goal of this work. Various variants for the renovation of Podlog substation are also presented. From the point of view of operational reliability, it was most appropriate to replace the old transformator with a new one. Replacement of the 220/110 kV transformer with a new 400/110 kV transformer was necessary due to operational condition and cancellation of 220 kV voltage level.

Keywords:electric power system, transmission of electric energy, transformer, transformer substation

Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Back