izpis_h1_title_alt

Zasnova in izvedba sistema za upravljanje in nadzor čistilne naprave
ID Boneš, Luka (Author), ID Bračun, Drago (Mentor) More about this mentor... This link opens in a new window

.pdfPDF - Presentation file, Download (9,26 MB)
MD5: 7C91327E5BCF8C39B770C8F3B2705B94

Abstract
V podjetju je bilo potrebno izdelati čistilno napravo za čiščenje odpadnih industrijskih vod, ki bo zagotavljala, da prečiščene vode ustrezajo kriterijem za izpust v kanalizacijsko omrežje. Najpomembnejši parameter, ki ga mora sistem zagotoviti je ph raztopine. Poleg ph-ja je potrebno meriti volumen in pretok raztopine skozi cisterno, ki sem ga meril z ultra zvočnim senzorjem. Glavna kriterija pri izbiri komponent sta bila zanesljivost in cena. Oddaljen nadzor in upravljanje sem izvedel preko Blynk platforme.\\ V testnem obdobju se je izkazalo, da čistilna naprava zagotavlja primerno čisto odpadno vodo. Za znižanje števila zastojev pa je potrebno zamenjati tip pretočne črpalke.

Language:Slovenian
Keywords:čistilne naprave, zasnova krmiljenja, SCADA nadzorni sistem, oddaljen nadzor, vizualizacija podatkov, industrijske odpadne vode
Work type:Master's thesis/paper
Typology:2.09 - Master's Thesis
Organization:FS - Faculty of Mechanical Engineering
Place of publishing:Ljubljana
Publisher:[L. Boneš]
Year:2020
Number of pages:XXII, 61 str.
PID:20.500.12556/RUL-115396 This link opens in a new window
UDC:621.398:628.32(043.2)
COBISS.SI-ID:15977987 This link opens in a new window
Publication date in RUL:25.04.2020
Views:1822
Downloads:266
Metadata:XML DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Design and implementation of the system for management and control of wastewater treatment plant
Abstract:
The company had to build an industrial wastewater treatment plant to ensure that the treated water met the criteria for discharge into the sewerage system The most important parameter the system has to provide is the pH of the solution. In addition to the pH value, it is necessary to measure the volume and flow of the solution through the tank, for which I used an ultrasonic sensor. The main criteria for the selection of the components were reliability and price. We implemented remote control and management using the Blynk platform. \\ During the trial period it was shown that the treatment plant provides sufficient clean treated water. However, to further improve the reliability of the system, the flow pump type must be replaced.

Keywords:wastewater treatment plant, design control, SCADA, remote control, data visualization, industrial wastewater

Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Back