Podrobno

Analiza časov izdelave pri proizvodnji mehke poliuretanske pene
ID Tomšič, Luka (Avtor), ID Kušar, Janez (Mentor) Več o mentorju... Povezava se odpre v novem oknu, ID Berlec, Tomaž (Komentor)

.pdfPDF - Predstavitvena datoteka, prenos (6,51 MB)
MD5: F148B108ABCCB7BFE6C975996E0AD7B9

Izvleček
V diplomski nalogi so predstavljeni rezultati študije časov na delovnih mestih v proizvodnji mehke poliuretanske pene. Za izvedbo analize sta bili uporabljeni dve metodi, in sicer slika delovnega dne in metoda naključnega snemanja. Iz slike delovnega dne smo dobili podatke o dejansko porabljenih časih za izvedbo posameznih elementov delovnega procesa, ki izdelkom dodajajo dodano vrednost, in o časovnih izgubah pri izvajanju dela. Za ugotavljanje deležev posameznih časovnih struktur dejavnosti na delovnih mestih smo uporabili metodo naključnega snemanja, ki je trajala 21 delovnih dni. Na osnovi rezultatov obeh analiz smo določili časovne normative, ki jih bo podjetje uporabljalo za potrebe načrtovanja in vodenja proizvodnje. Naloga se zaključi s predlogi za stalne izboljšave pri odpravljanju časovnih izgub.

Jezik:Slovenski jezik
Ključne besede:Analiza delovnega mesta, časovni normativ, slika delovnega dne, metoda naključnih snemanj, procesne izgube
Vrsta gradiva:Diplomsko delo/naloga
Tipologija:2.11 - Diplomsko delo
Organizacija:FS - Fakulteta za strojništvo
Kraj izida:Ljubljana
Založnik:[L. Tomšič]
Leto izida:2019
Št. strani:XXIV, 89 str.
PID:20.500.12556/RUL-106793 Povezava se odpre v novem oknu
UDK:658.5:678.664(043.2)
COBISS.SI-ID:16529435 Povezava se odpre v novem oknu
Datum objave v RUL:18.03.2019
Število ogledov:2086
Število prenosov:235
Metapodatki:XML DC-XML DC-RDF
:
TOMŠIČ, Luka, 2019, Analiza časov izdelave pri proizvodnji  mehke poliuretanske pene [na spletu]. Diplomsko delo. Ljubljana : L. Tomšič. [Dostopano 31 marec 2025]. Pridobljeno s: https://repozitorij.uni-lj.si/IzpisGradiva.php?lang=slv&id=106793
Kopiraj citat
Objavi na:Bookmark and Share

Sekundarni jezik

Jezik:Angleški jezik
Naslov:Analysis of manufacturing times in the production of soft polyurethane foam
Izvleček:
The diploma paper presents the results of a study of the time at workplaces in the production of soft polyurethane foam. In order to carry out the analysis, two methods were used, namely, a picture of a working day and a method of random recording. From the image of a working day, we received information on the actual times spent for the implementation of individual elements of the work process, which add added value to products and time losses in the performance of the work. In order to determine the proportions of individual time structures of workplace activities, we used the random recording method, which lasted 21 working days. On the basis of the results of both analyzes, we have defined the time norms that the company will use for the purposes of planning and managing production. The task concludes with proposals for continuous improvement in time loss elimination.

Ključne besede:Work station analysis, time norms, a picture of working day, random recording method, waste in production processes

Podobna dela

Podobna dela v RUL:
  1. The definition of squeeze casting technology for production of die castings
  2. Karakterizacija in kakovost aluminijevih zlitin za tlačno litje
  3. Izdelava in predelava zlitine EN AW 6082 z dodatkom cirkonija
  4. influence of cooling rate and nucleation potential on mechanical properties of AlSi9Cu3
  5. synthesis and characterization of selective laser melted AlSi10Mg alloy
Podobna dela v drugih slovenskih zbirkah:
  1. Stališča slovenskih državljanov do varnostnih tveganj pri obratovanju Nuklearne elektrarne Krško
  2. Energy and safety aspects of the fissile exploitation of nuclear energy
  3. District heating of Krško-Brežice region with help of Nuclear power plant Krško
  4. Vpliv jedrske elektrarne na okolico, radioaktivni odpadki in ukrepi za preprečitev ekoloških nesreč
  5. Renewable of warehousing of low and middle radioactive materials in NEK

Nazaj