Magistrska naloga je potekala v steklarni, kjer se ukvarjajo s proizvodnjo embalažnega stekla višjega kakovostnega razreda. Zaradi velikega povpraševanja trga po majhnih serijah izdelkov, prihaja do povečanega števila menjav orodij. V magistrski nalogi so se popisale teoretične osnove vitke proizvodnje in metode hitre menjave orodij. Izvedli so se vsi koraki metode hitre menjave orodij. V nalogi se je izboljšal sistem zapisovanja, računanja in merjenja časa trajanja menjave. Pri tem so se dobile realne vrednosti časov trajanja menjav in s tem povezan pravilen izračun faktorja skupne učinkovitosti opreme. S pomočjo metode hitre menjave orodij se je skrajšal čas menjave orodja. Pri tem se je uvedel nov sistem menjave s postopnim zagonom posameznih sekcij, ki nam omogoča, da v enakem časovnem obdobju v hladilno peč spravimo več dobrih kosov. Pripravila so se navodila za menjavo po novem postopku. S tem se je čas menjave bistveno skrajšal.

Jezik:Slovenski jezik
Ključne besede:vitka proizvodnja metoda hitre menjave orodij (SMED) računaje časov trajanja menjave orodij ločevanje časov trajanja menjave orodij postopno zaganjanje stroja po sekcijah skrajšanje časa menjave orodij
Vrsta gradiva:Magistrsko delo/naloga
Organizacija:FS - Fakulteta za strojništvo
Leto izida:2018
PID:20.500.12556/RUL-105096 Povezava se odpre v novem oknu
Datum objave v RUL:25.10.2018
Število ogledov:1464
Število prenosov:413
Metapodatki:XML RDF-CHPDL DC-XML DC-RDF
:
Kopiraj citat
Objavi na:Bookmark and Share

Sekundarni jezik

Jezik:Angleški jezik
Naslov:Introduction the method Single Minute Exchange of Die in glass house
Izvleček:
Master’s thesis is about work in the glass house, where production of a top quality special glass packaging is taking place. Due to increase in demand for smaller series of products, a higher change of tools is marked. The theoretical basis of lean production and the methods of Single Minute Exchange of Die (SMED) are described in the thesis. Furthermore, all the steps of SMED have been executed. Recording system, counting system and system of time measurement of changing tools are improved in the thesis. When working with the accessible data, the real-time value of changing tools duration and with this related accurate calculation of overall equipment efficiency factor were obtained. With the help of the SMED method, the time for changing tools has shortened. The new system for changing tools with gradual setup of individual sections is introduced in the thesis. This system enables to put more pieces of glass, which comply with customers’ requirements, in the cooling oven in the same time - frame. As a result of before mentioned, the new instructions for changing tools according to the new process were prepared, which resulted in significantly reduced machine setup time.

Ključne besede:lean manufacturing method Single Minute Exchange of Die (SMED) calculating times for changing tools separating times for changing tools gradually starting the machine in sections reducing machine setup time