Skupna učinkovitost opreme
Škrbina, Domen (Author), Kušar, Janez (Mentor) More about this mentor... This link opens in a new window, Berlec, Tomaž (Co-mentor)

.pdfPDF - Presentation file, Download (6,00 MB)

Abstract
V diplomskem delu je obravnavan problem ugotavljanja učinkovitosti delovnih sredstev v individualni proizvodnji. Za izračun učinkovitosti delovnih sredstev smo uporabili metodo skupne učinkovitosti opreme – OEE. Za pridobitev pravilnih podatkov smo v informacijskem sistemu MES vpeljali modul za spremljanje zastojev ter primerjali normirane čase z dejansko porabljenimi časi za izvedbo delovnih operacij. S pridobljenimi podatki smo izračunali skupno učinkovitost opreme – OEE ter pripadajoče kazalnike. Ugotovili smo, da je planirana zasedenost delovnih sredstev mnogo večja, kot pa je dejanska učinkovitost delovnih sredstev. Na koncu smo podali še predlog za izboljšanje beleženja zastojev ter tudi predloge za večjo učinkovitost delovnih sredstev.

Language:Slovenian
Keywords:Spremljanje proizvodnje, OEE, normirani časi, doseganje norme, zastoji na delovnem sredstvu.
Work type:Bachelor thesis/paper (mb11)
Tipology:2.11 - Undergraduate Thesis
Organization:FS - Faculty of Mechanical Engineering
Year:2018
Publisher:[D. Škrbina]
UDC:658.511.5(043.2)
COBISS.SI-ID:16410395 Link is opened in a new window
Views:191
Downloads:126
Metadata:XML RDF-CHPDL DC-XML DC-RDF
 
Average score:(0 votes)
Your score:Voting is allowed only to logged in users.
:
Share: Bookmark and Share

Secondary language

Language:English
Title:Overall equipment efficiency
Abstract:
The diploma thesis discusses the problem of assessing the efficiency of work centers in an individual production. To calculate the efficiency of the work centers we used a method of overall equipment efficiency – OEE. In order to get the correct data, we introduced in the information system MES a module for recording the downtimes and compared the normative times with the actually time, used for the execution of the work operations. With the acquired data we calculated the collective efficiency of the equipment – OEE and corresponding indicators. We found out that the planned occupancy of the work centers is much higher than the actual efficiency of the work centers. At the end we also offered a proposition for the improvement of recording the downtimes and for better efficiency of the work centers.

Keywords:production monitoring, OEE, normative times, normative achivement, workcenter downtimes.

Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Comments

Leave comment

You have to log in to leave a comment.

Comments (0)
0 - 0 / 0
 
There are no comments!

Back