Your browser does not allow JavaScript!
JavaScript is necessary for the proper functioning of this website. Please enable JavaScript or use a modern browser.
Open Science Slovenia
Open Science
DiKUL
slv
|
eng
Search
Browse
New in RUL
About RUL
In numbers
Help
Sign in
Geotehnična analiza nasipa za izvlečni tir iz Luke Koper : magistrsko delo
ID
Ponikvar, Karin
(
Author
),
ID
Petkovšek, Ana
(
Mentor
)
More about this mentor...
,
ID
Maček, Matej
(
Comentor
)
PDF - Presentation file,
Download
(8,31 MB)
MD5: 4F7E9ECAA12C92E8E9BB081BFEEDBAA0
PID:
20.500.12556/rul/9c34f295-39e1-4522-a94b-c9d6a96a6c7e
PDF - Appendix,
Download
(2,91 MB)
MD5: 40C5E052073FA2D7EBB599297AA86F07
PID:
20.500.12556/rul/b5b513ae-d0a6-4514-acc5-5700f9001936
PDF - Appendix,
Download
(479,79 KB)
MD5: D69ABB58E85EC93535D8F75E607B3A67
PID:
20.500.12556/rul/4c9ac17d-4fa8-484f-9eb8-9097cfc7e780
This document has even more files. Complete list of files is available
below
.
Image galllery
Abstract
Zmogljivost obstoječe proge Divača – Prešnica – Koper v prihodnosti ne bo več zadoščala potrebam Luke Koper, zato je predvidena gradnja 2. tira Divača – Koper. Projekt vključuje tudi izgradnjo t.i. izvlečnega tira iz Luke, skupne dolžine 1,2 km. Ta poteka po nasipu na mehkih tleh. Med gradnjo se pogosto zgodi, da so geotehnične razmere drugačne od projektno predvidenih. Večina vzrokov za “geološko-geotehnična presenečenja” se skriva v kvaliteti in premajhnem obsegu geološko geotehničnih raziskav, da bi opisali celotno geološko sestavo tal ter v neustrezni interpretaciji rezultatov meritev. V magistrskem delu smo izvedli povratno geološko geotehnično analizo nasipa za izvlečni tir in reinterpretacijo podatkov terenskih meritev. Dobljene rezultate smo primerjali s podatki, ki jih navaja geološko-geotehnični elaborat. Vrednotili smo rezultate statičnega konusnega penetrometra, dilatometra in laboratorijskih preiskav ter ugotavljali skladnost interpretacije. Na podlagi primerjave velikosti posedkov in časa konsolidacije izdelanega računskega modela z izračuni v projektni dokumentaciji smo ocenili ali je bil projekt izveden varno, skladno z napovedmi in racionalno. Za analizo stanja nasipa po izgradnji smo vrednotili rezultate posedkov, ki so bili izmerjeni s horizontalnimi inklinometri.
Language:
Slovenian
Keywords:
DMT
,
CPT
,
posedki
,
stabilnost
,
horizontalni inklinometri
Work type:
Master's thesis/paper
Typology:
2.09 - Master's Thesis
Organization:
FGG - Faculty of Civil and Geodetic Engineering
Publisher:
[K. Ponikvar]
Year:
2018
PID:
20.500.12556/RUL-99351
UDC:
624.136.2(497.4Luka Koper)(043.3)
COBISS.SI-ID:
8324705
Publication date in RUL:
18.01.2018
Views:
3087
Downloads:
1439
Metadata:
Cite this work
Plain text
BibTeX
EndNote XML
EndNote/Refer
RIS
ABNT
ACM Ref
AMA
APA
Chicago 17th Author-Date
Harvard
IEEE
ISO 690
MLA
Vancouver
:
Copy citation
Share:
Secondary language
Language:
English
Title:
Geotechnical analysis of the embankment for the service track from Luka Koper : master thesis
Abstract:
To increase the capacity of the railway Divača – Prešnica – Koper, which in the future will no longer satisfy the needs of Luka Koper, the construction of the 2nd railway track Divača – Koper is planned. The project includes the construction of a service track, with a total length of 1.2 km. Part of the track runs on the embankment, which is the subject of this master's thesis. Often happens that geotechnical conditions at the construction site are different from the projected ones. The main causes of “geological-geotechnical surprises” are the inadequate quantity and quality of geological geotechnical investigation and wrong interpretation of the results. In the thesis reverse geological geotechnical analysis of the embankment and reinterpretation of measurements was performed. The obtained results were compared with the data provided by the geological- geotechnical design. Based on the comparison of the cone penetration test, flat dilatometer test and laboratory test results, we found out in which case the individual test gives inadequate result. The settlements and consolidation time of the material model was compared with the data in the project documentation, to determine if the project was implemented safely, rationally and according to the prognosis. In order to analyze the embankment after the construction, we evaluate the settlements that were measured with horizontal inclinometers.
Keywords:
DMT
,
CPT
,
settlements
,
stability
,
horizontal inclinometers
Similar documents
Similar works from RUL:
Similar works from other Slovenian collections:
Files
Loading...
Back