izpis_h1_title_alt

Integracija hitrih priključnih sponk v pametni merilnik električne energije
ID Dostal, Žiga (Author), ID Klemenc, Jernej (Mentor) More about this mentor... This link opens in a new window

.pdfPDF - Presentation file, Download (8,41 MB)
MD5: CB41C49AB69C4214FE7C87812BB78558
PID: 20.500.12556/rul/235b45f7-e708-4d88-a857-20a9477e2024

Abstract
Trenutna izvedba pametnega merilnika električne energije temelji na principu pritrditve energetskih kablov s sistemom vijačenja. Gre za zamuden postopek, problem pa predstavlja tudi zanesljivost pritrditve, saj oseba, ki pritrjuje kable, nima povratne informacije ali so kabli resnično dobro pritrjeni. Magistrsko delo je rezultat razvojnega procesa, pri čemer se je v enofazni in trifazni števec vgradilo hitre priključne sponke, ki odpravijo opisane pomanjkljivosti. Izdelana sta bila prototipa obeh verzij merilnika. Na prototipu je bil izmerjen navor, ki je potreben za montažo vodnikov.

Language:Slovenian
Keywords:električni merilnik pametni merilnik hitre priključne sponke pritrditev vodnikov spenjalni spoj meritev navora hitra izdelava prototipov
Work type:Master's thesis/paper
Organization:FS - Faculty of Mechanical Engineering
Year:2017
PID:20.500.12556/RUL-95805 This link opens in a new window
Publication date in RUL:21.09.2017
Views:1615
Downloads:254
Metadata:XML RDF-CHPDL DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Integration of fast clamps in smart electricity meter
Abstract:
Wires on current smart electricity meters are attached to the meter with screws. Installing with screws is a time-consuming procedure. Reliability is also a problem, because a person who installs wires, doesn't have a feedback if they are attached correctly. Master thesis is a result of a development process where fast clamps were integrated into the single- and three-phase meter in order to avoid the before-mentioned problems. Both of the meters with the integrated fast clamps were manufactered as working prototypes. Torque measurement for attaching wires was also made on one prototype.

Keywords:electricity meter smart meter fast clamps attaching wire snap fit torque measurement rapid prototyping

Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Back