Časovne izgube pri proizvodnji hidromehanske opreme
ID Zevnik, Neža (Author), ID Kušar, Janez (Mentor) More about this mentor... This link opens in a new window, ID Berlec, Tomaž (Comentor)

.pdfPDF - Presentation file, Download (5,16 MB)
MD5: E74C5DC87D89EE516746414F6BCC3F18
PID: 20.500.12556/rul/c2d161e1-0bd1-477f-a3c8-db156c025b62
.pdfPDF - Appendix, Download (603,78 KB)
MD5: EF86ED9288A546248201DA8F60B533C3
PID: 20.500.12556/rul/0755b2e3-ac86-450f-a470-d96dea1f3180
.pdfPDF - Appendix, Download (480,09 KB)
MD5: 062B2BF0AAB48ACF8681197FC61C7B2E
PID: 20.500.12556/rul/9c09cd66-1a26-48b8-ab74-d80710152b27

Abstract
V magistrskem delu je obravnavan problem ugotavljanja učinkovitosti delovnih sredstev v individualni proizvodnji. Opisali smo metode za ugotavljanje časovnih izgub, sisteme za beleženje delovanja delovnih sredstev in potek izračuna skupne učinkovitosti delovnih sredstev. Z izbrano metodo naključnega snemanja (MNS) smo definirali časovne strukture in prepoznali izgube na delovnih sredstvih. Z zbranimi podatki smo skupno učinkovitost delovnih sredstev (OEE). Za primerjavo smo OEE izračunali tudi s podatki o delovanju delovnih sredstev pridobljenih iz operacijskih sistemov za beleženje obratovanja, to sta sistema SAP in MES. Iz primerjave obeh OEE smo ugotovili, da se beleženje zastojev na delovnih sredstvih v sistemih za beleženje delovanja delovnih sredstev ne izvaja dosledno in zato ne dobimo realne slike o dejanskih zastojih. Ugotovili smo tudi veliko odstopanje med normiranimi časi in dejansko porabljeni časi za izvedbo delovnih nalogiv, zato smo izvedli še hi^2 –test, ki je pokazal da so odstopanja časov statistično dokazljiva. V zaključku smo podali predlog za izboljšavo sistema za beleženje zastojev na delovnih sredstvih.

Language:Slovenian
Keywords:metoda naključnega snemanja, časovne strukture, OEE, normativni časi, doseganje norme
Work type:Master's thesis/paper
Organization:FS - Faculty of Mechanical Engineering
Year:2017
PID:20.500.12556/RUL-94922 This link opens in a new window
Publication date in RUL:11.09.2017
Views:1837
Downloads:864
Metadata:XML DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Time Losses at hydromechanical equipment manufacturing
Abstract:
In the master thesis we have researched the problem of equipment efficiency in individual production. We have described the methods for recoginsing time losses on working tools, operational systems for recording working tools's functions and described the course of calculating equipment efficiency. With selected multimoment method (MNS) we have defined time structures of working tools and have recognised losses that accoure. With the collected data we calculated overall equipment efficiency (OEE). For comparison we collected function data from operation systems MES and SAP for all observed working tools and calculated the OEE with those data. From calculated OEE comparison we discovered that there is no consistency of recording working tools stoppage in the systems, therefore we can not get the real picture of working tools function. The second problem we noticed was the deviation among real used time on working tool and prescribed theoretical normed time. We have done the hi^2 -test with collected real and theoretical used times, to prove the statistical significant difference. In the conclusion we suggest a new program for recording stoppage on machine tools.

Keywords:multimoment method, time structures, OEE, normative times, normative achivement