PROJEKTIRANJE NIZKONAPETOSTNEGA OMREŽJA IN TRANSFORMATORSKE POSTAJE PO ŽLEDOLOMU
ID VALENČIČ, DENI (Author), ID Ažbe, Valentin (Mentor) More about this mentor... This link opens in a new window

.pdfPDF - Presentation file, Download (3,14 MB)
MD5: 6240D1CEF1CB4FF43C2F109B57A8099D
PID: 20.500.12556/rul/6443662c-ae98-4e32-a793-18afa47f2b7b

Abstract
Po silovitem žledolomu, ki je zajel področje Elektro Primorske d. d. na širšem območju Postojne in Pivke, je bilo potrebno rekonstruirati veliko število poškodovanih elektroenergetskih naprav. Najprej so delavci izvajali popravila z najnujnejšimi ukrepi, da so zagotovili oskrbo odjemalcev z električno energijo. Nato je nastopila trajna in načrtovana obnova z ureditvijo dokumentacije. Tu me je podjetje vključilo v izdelavo projekta - elaborata za rekonstrukcijo nizkonapetostnega omrežja s pripadajočo transformatorsko postajo Prestranek grad. V nalogi je navedeno in analizirano obstoječe stanje omrežja. Izvedeni so tehnični izračuni za projektirano nizkonapetostno omrežje in transformatorsko postajo, vključno z ozemljitvami. Risbe - načrti so izdelani s programskim orodjem AutoCAD.

Language:Slovenian
Keywords:projektiranje, elaborat, transformatorska postaja, nizkonapetostno omrežje
Work type:Bachelor thesis/paper
Organization:FE - Faculty of Electrical Engineering
Year:2017
PID:20.500.12556/RUL-91825 This link opens in a new window
Publication date in RUL:21.04.2017
Views:2735
Downloads:509
Metadata:XML RDF-CHPDL DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:DESIGN OF A LOW-VOLTAGE NETWORK AND A TRANSFORMER STATION AFTER THE ICE STORM
Abstract:
As a result of the devastating freezing rain that fell on the territory of Elektro Primorska d. d., in the Postojna and Pivka regions, a lot of the electrical power distribution network was severely damaged and needed thorough reconstruction. First, workers performed all the necessary repair works so that the company was able to provide clients with electricity. When repair works were completed, a long-term reconstruction followed. It required accurate planning and producing documentation. I was employed by the company in the above-mentioned project to prepare a study for the reconstruction of low-voltage distribution network and the electrical substation Prestranek grad. This final thesis analyses the current state of the network. It also includes technical calculation for the reconstruction of the network and the substation together with grounding. The designs-layouts were made using AutoCAD programme tools.

Keywords:designing, a study, an electrical substation, low-voltage network