izpis_h1_title_alt

Plan montaže jeklene konstrukcije
ID Cigoj, Matjaž (Author), ID Hladnik, Leon (Mentor) More about this mentor... This link opens in a new window

.pdfPDF - Presentation file, Download (2,53 MB)
MD5: 8DEBB84B65A3392A59491250502B2511
PID: 20.500.12556/rul/f891590a-c8ea-45b5-af09-47a84c4404bf
.pdfPDF - Appendix, Download (196,61 KB)
MD5: 1D1D1D0363830B4507B550DA6B790B02
.pdfPDF - Appendix, Download (423,26 KB)
MD5: 703B0531873105349CA3CEBC50874186
This document has even more files. Complete list of files is available below.

Abstract
V gradbeništvu se jeklo veliko uporablja za gradnjo industrijskih hal, saj se te na klasičen način ne gradijo več. Jeklene industrijske hale so potresno varne, jeklena konstrukcija hale je lažja od betonske, nezahtevne so za vzdrževanje ter zgrajene v precej krajšem času. Cilj moje diplomske naloge je tako narediti plan montaže za proizvodno-skladiščni objekt Termit. V začetku sem opravil kratek pregled zakonodaje. Najprej sem napisal nekaj na splošno o ureditvi gradbišča in planu montaže, v nadaljevanju pa sem to naredil za moj izbrani primer. Opisan je postopek, kako je potrebno začeti z montažo konstrukcije ter kako zagotoviti varnost delno montirane konstrukcije. Vse je predstavljeno tudi z montažnimi risbami.

Language:Slovenian
Keywords:ureditev gradbišča, plan montaže, jeklena konstrukcija, zagotavljanje stabilnosti
Work type:Bachelor thesis/paper
Typology:2.11 - Undergraduate Thesis
Organization:FGG - Faculty of Civil and Geodetic Engineering
Publisher:[M. Cigoj]
Year:2017
PID:20.500.12556/RUL-91439 This link opens in a new window
UDC:624.014.2(497.4)(043.2)
COBISS.SI-ID:8051041 This link opens in a new window
Publication date in RUL:06.04.2017
Views:3587
Downloads:2359
Metadata:XML RDF-CHPDL DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Plan the installation of steel structure
Abstract:
In construction engineering, steel is widely used for the construction of industrial halls, because in the conventional way they do not to build more. Steel industrial buildings are earthquake-proof, steel construction hall is lighter than concrete, easy for maintenance and built in a much shorter time. The aim of my thesis is to make a plan for the installation of a production-storage facility Termit. First, I made a brief review of the legislation. Then I wrote about the general organization of the site and plan the installation, hereinafter referred to as I do to my concrete example. A procedure is described how it is necessary to begin with the installation of the structure and how to ensure the safety of partially assembled structure. Everything is presented with assembly drawings.

Keywords:organization site, plan of assembly, steel construction, ensure stability

Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Files

Loading...

Back