Stroškovna in časovna analiza izgradnje mostu : diplomska naloga
ID Bedek, Aleš (Author), ID Srdič, Aleksander (Mentor) More about this mentor... This link opens in a new window

.pdfPDF - Presentation file, Download (4,75 MB)
MD5: 6050DA2E8DA343ADCF05E1331D337C0F
PID: 20.500.12556/rul/c57490c1-6c2c-44f9-8904-ee54707fef3c

Abstract
Planiranje in vodenje projekta v gradbeništvu je zahtevno opravilo, saj je pri tem potrebno vnaprej natančno predvideti vsa potrebna dela, stroške in čas. Kvalitetno načrtovanje celotnega procesa in presoja bodočih stroškov sta sorazmerna s pravočasno in dobičkonosno izvedbo zadanega projekta. V diplomski nalogi je analizirano odstopanje stroškov in časa pri izgradnji oziroma rekonstrukciji mostu skupaj z ureditvijo regionalne ceste in rečne struge. Narejena je bila primerjava med pogodbenim predračunom in dejanskimi stroški izvajalca ter primerjava med pogodbenim terminskim planom in realnim potekom del. Podrobneje je opisan potek same izgradnje obravnavanega objekta, kot tudi razporeditev delovne sile in gradbene mehanizacije na gradbišču. Prav tako so natančneje obravnavane tudi spremembe v projektu, ki so doprinesle k časovnim zamikom med gradnjo in nepričakovanim stroškom.

Language:Slovenian
Keywords:gradbeništvo, diplomska dela, VSŠ, OG-MO, mostovi, rekonstrukcija, terminski plan, stroški, analiza, odstopanja
Work type:Bachelor thesis/paper
Typology:2.11 - Undergraduate Thesis
Organization:FGG - Faculty of Civil and Geodetic Engineering
Place of publishing:Ljubljana
Publisher:[A. Bedek]
Year:2015
Number of pages:XX, 42 str., 10 pril.
PID:20.500.12556/RUL-72688 This link opens in a new window
UDC:005:69:624.21(043.2)
COBISS.SI-ID:7173473 This link opens in a new window
Publication date in RUL:29.09.2015
Views:3624
Downloads:486
Metadata:XML DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Cost and time analysis of bridge construction project
Abstract:
Planning and project management in civil engineering is a challenging task, because it is essential to closely predict all the required work, cost and time in advance. Quality process planning and the evaluation of future costs are proportional to profitably complete a set project in time. This graduation thesis analyzes the deviation of costs and time during the reconstruction of the bridge together with the arrangement of the regional road and the riverbed. Two comparisons were made; one between the contract pre-assessment of costs and the actual cost to the contractor, and one between the contract schedule and the actual progress of the work. The construction progress of the facility was described in detail, as well as the distribution of labor and construction machinery at the construction site. Changes in the project which contributed to unexpected costs and additional lag time during construction were also specifically described in the graduation thesis.

Keywords:graduation thesis, civil engineering, bridges, reconstruction, time schedule, costs, analysis, deviations