izpis_h1_title_alt

Ocena energetskega potenciala mHE Mešič na Paki : diplomska naloga
ID Čebul, Mojca (Author), ID Kryžanowski, Andrej (Mentor) More about this mentor... This link opens in a new window

.pdfPDF - Presentation file, Download (10,81 MB)
MD5: 9B75F43A35259620C157179486431369
PID: 20.500.12556/rul/8eeb8a09-3e40-4b9b-9bf0-d6fafd365aa3

Abstract
Diplomsko delo obravnava oceno energetskega potenciala na reki Paki z izgradnjo mHE in je nastalo na podlagi zgodovinskih načrtov iz leta 1917, ki so predidevali izgradnjo mHE na izbrani lokaciji. Namen naloge je podati oceno energetskega potenciala z današnjimi razmerami in nadalje oceniti stroške investicije. V prvem delu je opisan pomen hidroenergije v Sloveniji in njen zgodovinski razvoj. V drugem delu smo opisali obstoječe stanje, analizirali hidrologijo in opravili geodetske meritve. V programu HEC RAS smo izdelali hidravlični model in določili potek vodne gladine za različne karakteristične profile pretoka. Nato smo v vodotok vstavili prag z namenom povečanja nivoja zgornje vode in s tem tudi bruto padca. Na podlagi pretočnih krivulj za zgornjo in spodnjo vodo, pridobljenih iz programa HEC RAS, smo izvedi račun za vodno bilanco in energetsko proizvodnjo za različne vrednosti instaliranega pretoka. V tretjem delu smo izdelali idejni načrt ter izbrali štiri prekatno regulacijsko Banki turbino. Nato smo na podlagi obstoječih načrtov izdelali približno oceno stroškov gradbenih del in vzdrževanja, strojne in hidromehanske opreme. Izračun smo opravili za dva primera dovoda vode k turbini; preko tunela s postopkom mikrotunellinga in z izvedbo kanala vzdolž vodotoka. Sledila je izdelava občutljivostnih analiz. Cilj naloge je bila ugotovitev, če je investicija v izgradnjo mHE še utemeljena.

Language:Slovenian
Keywords:gradbeništvo, diplomska dela, UNI, male hidroelektrarne, hidrologija, vodna bilanca
Work type:Undergraduate thesis
Typology:2.11 - Undergraduate Thesis
Organization:FGG - Faculty of Civil and Geodetic Engineering
Place of publishing:Ljubljana
Publisher:[M. Čebul]
Year:2014
Number of pages:XIV, 71 str., [10] pril.
PID:20.500.12556/RUL-32497 This link opens in a new window
UDC:556.53:627.8(497.4Mešič)(043.2)
COBISS.SI-ID:6831969 This link opens in a new window
Publication date in RUL:10.07.2015
Views:4445
Downloads:536
Metadata:XML DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Assessment of hydropower potential of Mešič HPP on Paka River
Abstract:
The thesis deals with the assessment of the energy potential on the Paka River with construction of small hydro power plant, and it was created on the basis of historical plans from the year 1917, which predicted the construction of the small HPP at the selected location. Its purpose is to provide an assessment of the energy potential of the today's situation and to further assess the cost of investment. The first part describes the importance of hydropower in Slovenia and its historical development. In the second part we describe the existing situation, we analyze the hydrology and we passed the geodetic measurements. We have developed a hydraulic model in the program HEC RAS and determine the course of surface water for different characteristic flow profiles. Then we inserted threshold in the stream in order to increase the upper water level and thus the gross fall. Based on the flow curves for the upper and lower water obtained from the HEC RAS program, we calculated water balance and energy production for various installed power flow values. In the third part we have developed conceptual design and selected four ventricular regulating Banki turbine. Then we have made a rough assessment of the cost for the construction and maintenance, mechanical and hydromechanical equipment, on the basis of the existing plans. The calculation was performed for two cases of water inlet to the turbine; through the tunnel with the procedure of mikrotunelling and by building a channel along the stream. Then we have made sensitivity analysis. The aim of the project was to determine if the investment in the construction of small HPP is still justified.

Keywords:graduation thesis, civil engineering, small hydro power plant, hydrology, water balance, HEC RAS

Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Back