Your browser does not allow JavaScript!
JavaScript is necessary for the proper functioning of this website. Please enable JavaScript or use a modern browser.
Repository of the University of Ljubljana
Open Science Slovenia
Open Science
DiKUL
slv
|
eng
Search
Browse
New in RUL
About RUL
In numbers
Help
Sign in
Details
DELOVANJE, VZDRŽEVANJE IN POSODOBITVE MALE HIDROELEKTRARNE SAVA
ID
URBANC, JAN
(
Author
),
ID
Ažbe, Valentin
(
Mentor
)
More about this mentor...
PDF - Presentation file,
Download
(6,67 MB)
MD5: 8D6F426DC41213BCABB070FB03A4819A
PID:
20.500.12556/rul/3133acbb-07c0-4f18-8f83-59e4638339b4
Image galllery
Abstract
V Sloveniji je bilo v letih od 1900 pa do 1950 inštaliranih mnogo malih hidroelektrarn. Ker je tehnologija izdelave večinoma zelo dobra, mnoge od njih delujejo še danes. Časovno gledano je MHE Sava primer take elektrarne. To pomeni, da so za sledenje sodobnim gospodarskim trendom potrebne posodobitve. Današnji trend teži k zmanjšanju naprav za upravljanje postrojev. S tem se uvajajo nove tehnologije, ki omogočajo daljinski nadzor hidroelektrarn. Vse to pripomore k boljšemu izkoristku na račun hitrejšega odziva stikalnega manipulanta v primeru izpada. Možnih novosti na vseh delih elektrarne je mnogo. Ker dotrajana in stara tehnologija ne omogoča koraka z modernimi smernicami sem se odločil, da raziščem kakšne so današnje možnosti za posodobitev MHE Sava. Rezultat, ki ga pričakujem je povečanje proizvodnje, večja zanesljivost obratovanja in zmanjšanje tekočega vzdrževanja. Poleg vseh tehnoloških izboljšav je pričakovano, da se bo s posodobitvijo povečala varnost za osebje.
Language:
Slovenian
Keywords:
Male hidroelektrarne
,
MHE Sava
,
Sava
,
posodobitve HE
,
hidroelektrarne
Work type:
Bachelor thesis/paper
Organization:
FE - Faculty of Electrical Engineering
Year:
2014
PID:
20.500.12556/RUL-29505
Publication date in RUL:
18.09.2014
Views:
3758
Downloads:
1656
Metadata:
Cite this work
Plain text
BibTeX
EndNote XML
EndNote/Refer
RIS
ABNT
ACM Ref
AMA
APA
Chicago 17th Author-Date
Harvard
IEEE
ISO 690
MLA
Vancouver
:
URBANC, JAN, 2014,
DELOVANJE, VZDRŽEVANJE IN POSODOBITVE MALE HIDROELEKTRARNE SAVA
[online]. Bachelor’s thesis. [Accessed 18 March 2025]. Retrieved from: https://repozitorij.uni-lj.si/IzpisGradiva.php?lang=eng&id=29505
Copy citation
Share:
Secondary language
Language:
English
Title:
OPERATION, MAINTENANCE AND MODERNISATION OF SMALL HYDRO POWER PLANT SAVA
Abstract:
From 1900 until 1950, there were a lot of small hydro power plants built in Slovenia. Because of good quality of construction and good maintenance, a lot of them still work today. A long ago, power plant Sava was built and placed on today’s location. This means that in order for Sava to be connected with the present status of electrical production facilities, new technologies need to be installed. There are new technologies that allow remote control of hydro power plants. These technologies allow better efficiency. In case of fault, the response manipulator can easily resolve the error. The possibilities to improve operation systems of small power plants are endless. Because old technology does not allow the connecting with the modern technology, I decided to explore the possibilities to improve power plant Sava. Results which I expect are increased working reliability, better outcome, lower the cost of maintenance and increase safety of the manipulators.
Keywords:
Small hydro power plants
,
improvements
,
hydro power plants
Similar documents
Similar works from RUL:
Design of shopping centre
Design project of four - storey parking garage composite floors
Construction of a stainless steel storage tank for phosphoric acid
Design of steel business structure
Analysis and design of prestressed railway bridge deck
Similar works from other Slovenian collections:
45 m long composite bridge
55 m long composite bridge
Composite bridge over the span of 30,00 m
COMPOSITE ROAD BRIDGE WITH THE SPAN OF55 M FROM STEEL S355
Bridge of composite steel and concrete structures with 50 m spanning
Back