izpis_h1_title_alt

DELOVANJE, VZDRŽEVANJE IN POSODOBITVE MALE HIDROELEKTRARNE SAVA
URBANC, JAN (Author), Ažbe, Valentin (Mentor) More about this mentor... This link opens in a new window

.pdfPDF - Presentation file, Download (6,67 MB)

Abstract
V Sloveniji je bilo v letih od 1900 pa do 1950 inštaliranih mnogo malih hidroelektrarn. Ker je tehnologija izdelave večinoma zelo dobra, mnoge od njih delujejo še danes. Časovno gledano je MHE Sava primer take elektrarne. To pomeni, da so za sledenje sodobnim gospodarskim trendom potrebne posodobitve. Današnji trend teži k zmanjšanju naprav za upravljanje postrojev. S tem se uvajajo nove tehnologije, ki omogočajo daljinski nadzor hidroelektrarn. Vse to pripomore k boljšemu izkoristku na račun hitrejšega odziva stikalnega manipulanta v primeru izpada. Možnih novosti na vseh delih elektrarne je mnogo. Ker dotrajana in stara tehnologija ne omogoča koraka z modernimi smernicami sem se odločil, da raziščem kakšne so današnje možnosti za posodobitev MHE Sava. Rezultat, ki ga pričakujem je povečanje proizvodnje, večja zanesljivost obratovanja in zmanjšanje tekočega vzdrževanja. Poleg vseh tehnoloških izboljšav je pričakovano, da se bo s posodobitvijo povečala varnost za osebje.

Language:Slovenian
Keywords:Male hidroelektrarne, MHE Sava, Sava, posodobitve HE, hidroelektrarne
Work type:Bachelor thesis/paper (mb11)
Organization:FE - Faculty of Electrical Engineering
Year:2014
Views:1502
Downloads:1186
Metadata:XML RDF-CHPDL DC-XML DC-RDF
 
Average score:(0 votes)
Your score:Voting is allowed only to logged in users.
:
Share:AddThis
AddThis uses cookies that require your consent. Edit consent...

Secondary language

Language:English
Title:OPERATION, MAINTENANCE AND MODERNISATION OF SMALL HYDRO POWER PLANT SAVA
Abstract:
From 1900 until 1950, there were a lot of small hydro power plants built in Slovenia. Because of good quality of construction and good maintenance, a lot of them still work today. A long ago, power plant Sava was built and placed on today’s location. This means that in order for Sava to be connected with the present status of electrical production facilities, new technologies need to be installed. There are new technologies that allow remote control of hydro power plants. These technologies allow better efficiency. In case of fault, the response manipulator can easily resolve the error. The possibilities to improve operation systems of small power plants are endless. Because old technology does not allow the connecting with the modern technology, I decided to explore the possibilities to improve power plant Sava. Results which I expect are increased working reliability, better outcome, lower the cost of maintenance and increase safety of the manipulators.

Keywords:Small hydro power plants, improvements, hydro power plants

Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Comments

Leave comment

You have to log in to leave a comment.

Comments (0)
0 - 0 / 0
 
There are no comments!

Back