Details

Primer uporabe 5D informacijskega modela stavbe : diplomska naloga
ID Videmšek, Luka (Author), ID Cerovšek, Tomo (Mentor) More about this mentor... This link opens in a new window

.pdfPDF - Presentation file, Download (4,64 MB)
MD5: 2B6C2501B95F843D6BF1D455EE1380CE
PID: 20.500.12556/rul/8da733bb-e775-4289-baa8-9c30e19ad335

Language:Slovenian
Keywords:diplomske naloge, gradbeništvo, 3D modeli, sroški, čas, virtualna gradnja, optimizacija
Work type:Undergraduate thesis
Typology:2.11 - Undergraduate Thesis
Organization:FGG - Faculty of Civil and Geodetic Engineering
Place of publishing:Ljubljana
Publisher:[L. Videmšek]
Year:2011
Number of pages:XII, 89 str., 27 str. pril.
PID:20.500.12556/RUL-27842 This link opens in a new window
UDC:624:004.946(043.2)
COBISS.SI-ID:5480033 This link opens in a new window
Publication date in RUL:11.07.2014
Views:3801
Downloads:527
Metadata:XML DC-XML DC-RDF
:
VIDEMŠEK, Luka, 2011, Primer uporabe 5D informacijskega modela stavbe : diplomska naloga [online]. Bachelor’s thesis. Ljubljana : L. Videmšek. [Accessed 6 April 2025]. Retrieved from: https://repozitorij.uni-lj.si/IzpisGradiva.php?lang=eng&id=27842
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:A use case for a 5D building information model
Keywords:civil engineering, graduation thesis, 3D models, costs, time, virtual construction, rational realization

Similar documents

Similar works from RUL:
  1. ǂThe ǂuse of 4D models in construction
  2. BIM use for fire-safety analysis
  3. BIM for sustainable design and energy efficiency improvements
  4. Seismic analysis of a multi-storey building
  5. Analysis on the use of BIM at the Brežice bypass design
Similar works from other Slovenian collections:
  1. Building information modeling (BIM):meaning and examples
  2. Integracija tehnologij industrije 4.0 za avtomatizacijo spremljanja procesa gradnje
  3. Culture change in construction industry: from 2D toward BIM based construction
  4. CONSTRUCTION MONITORING BY USING AUGMENTED REALITY ON THE CASE OF PILE DWELLERS SETTLEMENT
  5. Construction scheduling for wooden prefabricated houses using 4D building information models

Back