izpis_h1_title_alt

Reorganizacija proizvodnje po nakupu linije za oplaščanje elementov podbojev : diplomsko delo (visokošolski strokovni študij)
ID Zupan, Boštjan (Author), ID Oblak, Leon (Mentor) More about this mentor... This link opens in a new window, ID Kropivšek, Jože (Reviewer)

.pdfPDF - Presentation file, Download (462,31 KB)
MD5: 14473B50D65701F314FB42365ED6A163
PID: 20.500.12556/rul/e3ae13c7-2b33-4e7f-87f1-a9a0abb54dea

Abstract
Predstavili smo obstoječe in pričakovano stanje tehnologije ter izdelke za izdelavo suhomontažnih podbojev v podjetju LIP Bled. Na osnovi vplivnih dejavnikov smo izbrali najboljšega ponudnika linije in postavili linijo na osnovi lay-outa. Predstavili smo problematiko izdelave oplaščanja elementov, kjer izgubimo veliko časa zaradi prestavljanja stroja, saj izdelujemo 2 popolnoma različna elementa podboja. Z nakupom nove linije in lastno proizvodnjo oplaščanja elementov se bodo dobavni roki zmanjšali, fleksibilnost, s tem pa tudi konkurenčnost podjetja, pa povečala.

Language:Slovenian
Keywords:reorganizacija proizvodnje, podboji, oplaščanje elementov
Work type:Undergraduate thesis
Typology:2.11 - Undergraduate Thesis
Organization:BF - Biotechnical Faculty
Place of publishing:Ljubljana
Publisher:[B. Zupan]
Year:2007
Number of pages:IX, 47 f., [5 f. pril.]
PID:20.500.12556/RUL-220 This link opens in a new window
UDC:658.5:694.7
COBISS.SI-ID:1540489 This link opens in a new window
Publication date in RUL:11.07.2014
Views:1275
Downloads:205
Metadata:XML DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Production reorganization after the purchase of the door frame elements wrapping line : graduation thesis (higher professional studies)
Abstract:
The existent and expected state of technology for the production of door-frames factors the best offerer has been chosen and the production line installed on the lay-out basis. Problems of the production of wrapped elements were presented as well, because a lot of time is being lost due to adjustments of machines since 2 quite different elements of the door frame are being produced. By purchasing a new line and producing own wrapped elements the delivery terms will be shortened, flexibility increased, and herewith also the competitive position of the firm better.

Keywords:reorganization, door-frame, wrapped elements

Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Back