This master's thesis presents the most common approaches to upgrading gas turbine power plants. The main part of the work focuses on the analysis of a representative gas turbine upgrade using a dedicated thermodynamic model developed in the IPSEpro software environment. The model was used to evaluate steady-state operation before and after the upgrade. It is based on mass and energy balances of the main components and accounts for changes in air mass flow rate, compressor pressure ratio, and fuel flow rate. The gas turbine cycle before and after the upgrade was also compared using a T–s diagram. The results showed an increase in power output from 40.58 MW to 50.15 MW and in thermal efficiency from 32.36% to 35.71%, while the specific heat rate decreased by 9.38%. Particular attention was given to the turbine inlet temperature, which was determined analytically because direct measurement under actual flow conditions is challenging. The thermodynamic model was validated against thermal performance test data from the reference gas turbine power plant, with the calculated net power output deviating by 1.19%. The results demonstrate the applicability of the developed model for thermodynamic assessment of gas turbine power plant upgrades.
|