Details

Optimizacija večagentnega planiranja poti na podlagi časovne in prostorske analize prometa
ID Gabrijel, Anže (Author), ID Zdešar, Andrej (Mentor) More about this mentor... This link opens in a new window

.pdfPDF - Presentation file, Download (2,34 MB)
MD5: 01558E85A43C4E6381F2374F9CA26819

Abstract
V magistrskem delu obravnavamo vpliv sprememb grafovskega zemljevida na večagentno planiranje poti. Uporabili smo obstoječi načrtovalnik, ki pri izračunu poti in časovnih razporedov upošteva zasedenost cest in vozlišč zaradi drugih agentov. Iz podatkov realiziranih planov smo pripravili metrike za opis obiskov in čakanja na vozliščih, zasedenosti cest ter smeri prometnega toka. Vpliv med sebojnega oviranja smo ocenili s primerjavo osnovnega planiranja na praznem zemljevidu in interaktivnega planiranja ob upoštevanju drugih agentov. Na podlagi prostorskih in časovnih prikazov smo izbrali posege v zemljevid ter jih preverili s parnimi A/B-poskusi pri enakem toku nalog. Obravnavali smo dodajanje in usmerjanje cest, omejevanje čakanja, granulacijo ter kombini rane posege. Pri naključnem razporejanju nalog s štirimi agenti so neusmerjene krožne poti zmanjšale interaktivno skupno trajanje za 6,6% in interakcijski čas za 18,2%, medtem ko je samostojno usmerjanje cest interaktivno trajanje povečalo za 32,5%. V petih ponovitvah z različnimi naključnimi semeni se je interaktivno skupno trajanje v povprečju zmanjšalo za 7,18%, standardni odklon zmanjšanja pa je znašal 0,67 odstotne točke. Pri dveh porazdelitvah nalog izvor-ponor sta dodani cesti interaktivno trajanje zmanjšali za 6,4% oziroma 7,4%. Obremenitveni preizkusi so pokazali, da je učinek posegov odvisen tudi od stopnje obremenitve. Neusmerjene krožne poti so prvi izmerjeni nasičeni nivo premaknile z 10 na 12 agentov, pri 20 agentih in stalni zalogi nalog pa so dosegle 888 namesto 786 nalog na uro. Rezultati kažejo, da lokalno izboljšanje posamezne prometne metrike ne zagotavlja boljšega delovanja celotnega sistema; učinek je treba preveriti za konkreten zemljevid, načrtovalnik, porazdelitev nalog in stopnjo obremenitve.

Language:Slovenian
Keywords:graf, večagentno planiranje poti, optimizacija topologije, prometna analiza, ozko grlo, zasedenost, simulacija
Work type:Master's thesis/paper
Organization:FE - Faculty of Electrical Engineering
Year:2026
PID:20.500.12556/RUL-190630 This link opens in a new window
Publication date in RUL:30.10.2026
Views:129
Downloads:24
Metadata:XML DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Optimisation of Multi-Agent Path Planning Based on Temporal and Spatial Traffic Analysis
Abstract:
This master’s thesis investigates how modifications of a graph-based map affect multi-agent path planning. We used an existing planner that computes paths and time schedules while accounting for edge and node occupancy caused by other agents. From the realized plans, we derived metrics describing node visits, waiting, edge occupancy, and directional traffic flow. The effect of agent interactions was evaluated by comparing baseline planning on an empty map with interactive planning in the presence of other agents. Spatial and temporal visualizations were used to select map modifications, which were then evaluated through paired A/B experiments with identical task streams. The modifications included adding and directing edges, restricting waiting, subdividing edges, and combining several interventions. With four agents and randomly assigned tasks, bidirectional circular routes reduced total interactive duration by 6.6% and interaction time by 18.2%; directing selected edges increased interactive duration by 32.5%. Across five repetitions with different random seeds, total interactive duration was reduced by an average of 7.18%, with a standard deviation of 0.67 percentage points. For two source–destination task distributions, two added roads reduced interactive duration by 6.4% and 7.4%, respectively. Load tests further showed that the effect of a modification depends on system load. Bidirectional circular routes shifted the first observed saturation level from 10 to 12 agents and achieved 888 instead of 786 tasks per hour with 20 agents under a constant task backlog. The results demonstrate that improving a local traffic metric does not necessarily improve the complete system; each modification must be evaluated for the specific map, planner, task distribution, and load level.

Keywords:graph map, multi-agent path planning, topology optimization, traffic analysis, bottleneck, occupancy, simulation

Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Back