The paper investigates the impact of Battery Energy Storage System (BESS) integration on short-circuit (SC) contribution and protection selectivity in an 11 kV medium-voltage (MV) network located in Söderala, Sweden. The SC analysis is performed under weak-grid and strong-grid operating conditions to evaluate the impact of the upstream grid strength on fault contribution at the main busbar and BESS feeder locations. The results show that the upstream grid remains the dominant fault source at the main busbar, while locally connected BESS units become the dominant contributors to faults located electrically closer to the converter-interfaced sources. The Protection selectivity is evaluated using Time–Current Characteristic (TCC) analysis and verified through ShortCircuit Trace (SC Trace) simulations in DIgSILENT PowerFactory. The implemented protection scheme demonstrates a satisfactory selectivity, where faults are isolated by the protection device associated with the faulted section without unnecessary disconnection of healthy feeders. The findings indicate that a properly coordinated conventional overcurrent protection can maintain a reliable operation in inverter-dominated MV systems.
|