Details

Geodetska dela pri menjavi pragov železnice : diplomska naloga
ID Hribernik, Ida (Author), ID Kregar, Klemen (Mentor) More about this mentor... This link opens in a new window, ID Koler, Božo (Comentor)

.pdfPDF - Presentation file, Download (3,27 MB)
MD5: 5F889357D0CD9C6FDC036D5B7E0E0A86

Abstract
V diplomski nalogi bom obravnavala geodetska dela pri menjavi železniških pragov v vseh fazah izvedbenih del. Naloga temelji na teoretičnem opisu postopkov in metod geodetskih meritev. V nalogi bo predstavljena konstrukcija železniške proge s poudarkom na elementih zgornjega ustroja, kot so tirnice, pragovi in tirna geometrija. Nadalje bo podan opis geodetskih del pred, med in po menjavi pragov, kar vključuje izvedbo predizmere, izris načrta območja, izbiro ustreznih metod in instrumentarija za izvedbo del ter obdelavo in analizo meritev ter kontrolo lege in geometrije tira.

Language:Slovenian
Keywords:diplomske naloge, geodezija, železniška infrastruktura, menjava železniških pragov, regulacija tira, geodetske meritve, geodetski načrt
Work type:Bachelor thesis/paper
Typology:2.11 - Undergraduate Thesis
Organization:FGG - Faculty of Civil and Geodetic Engineering
Place of publishing:Ljubljana
Publisher:[I. Hribernik]
Year:2026
Number of pages:1 spletni vir (1 datoteka PDF (VII, 26 str.))
PID:20.500.12556/RUL-188082 This link opens in a new window
UDC:528.3:625.1(043.2)
COBISS.SI-ID:291742979 This link opens in a new window
Publication date in RUL:18.09.2026
Views:80
Downloads:15
Metadata:XML DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Surveying work in the replacement of railway sleepers
Abstract:
In my diploma thesis, I will examine surveying work performed during the replacement of railway sleepers across all phases of the construction process. The thesis is based on a theoretical description of procedures and methods of geodetic measurements. It will present the construction of a railway line with an emphasis on the elements of the superstructure, such as rails, sleepers, and track geometry. Furthermore, it will provide a description of surveying tasks before, during, and after sleeper replacement, which includes conducting preliminary measurements, drafting the area plan, selecting appropriate methods and instruments for the execution of works, processing and analysing the measured data, and performing control of the track position and geometry.

Keywords:graduation thesis, geodesy, railway infrastructure, railway sleeper replacement, track aligment, geodetic surveying, topographic survey

Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Back