Details

Optimizacija montažne linije za sestavo zgibnega mehanizma
ID Krenker, Jan (Author), ID Šimic, Marko (Mentor) More about this mentor... This link opens in a new window, ID Herakovič, Niko (Comentor)

.pdfPDF - Presentation file, Download (1,63 MB)
MD5: C5595B65325B99EC0180080AFEEC416F

Abstract
V diplomskem delu je obravnavan problem zastojev na avtomatizirani montažni liniji, ki so posledica neustreznega vpetja montažnega gnezda in konstrukcijskih omejenosti montažnega sistema. Cilj naloge je izboljšati zanesljivost in stabilnost montažnega procesa. Narejena je bila analiza zastojev, vizualno opazovanje, snovanje in implementacija rešitev. Uspešnost izvedenih izboljšav je bila preverjena s primerjalno analizo podatkov delovanja sistema pred in po implementaciji rešitev. Rezultati so pokazali zmanjšanje pogostosti zastojev in stabilnejšo delovanje linije.

Language:Slovenian
Keywords:montažna linija, montažno gnezdo, optimizacija procesa, analiza zastojev, konstrukcijske izboljšave, zastoji v proizvodnji
Work type:Bachelor thesis/paper
Typology:2.11 - Undergraduate Thesis
Organization:FS - Faculty of Mechanical Engineering
Place of publishing:Ljubljana
Publisher:[J. Krenker]
Year:2026
Number of pages:XII, 33 f.
PID:20.500.12556/RUL-185167 This link opens in a new window
UDC:658.515:005.935(043.2)
COBISS.SI-ID:287516931 This link opens in a new window
Publication date in RUL:25.07.2026
Views:163
Downloads:63
Metadata:XML DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Optimization of an assembly line for articulated mechanism
Abstract:
The thesis deals with the problem of jams on an automated assembly line, which is a consequence of inadequate clamping of the assembly nest and structural limitations of the mounting system. The aim of the task is to increase the reliability and stability of the assembly process. Jam analysis, visual observation, design and implementation of the solution were performed. The effectiveness of the improvements was verified by comparative analysis of system operation data before and after the implementation of the solution. The results thus show a reduction in the frequency of jams and more stable operation of the line.

Keywords:assembly line, assembly fixture, process optimization, congestion analysis, structural improvements, production downtime

Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Back