Analiza odstopanj od terminskega plana na projektu izgradnje polnega priključka na Celovško cesto : diplomska naloga
ID Vidović, Kristian (Author), ID Klinc, Robert (Mentor) More about this mentor... This link opens in a new window, ID Srdič, Aleksander (Comentor)

.pdfPDF - Presentation file, Download (2,38 MB)
MD5: 366C13315AFB05C37C138557D17A912B
.pdfPDF - Appendix, Download (2,82 MB)
MD5: BE55A6EEE40B252B87FCF868C50BC87A
.pdfPDF - Appendix, Download (1,58 MB)
MD5: C6BB665464B7749A8781E66EFC73FE17
This document has even more files. Complete list of files is available below.

Abstract
Terminsko planiranje projektov, ki je sestavni del operativnega planiranja, predstavlja enega ključnih procesov v gradbeni operativi. Ko je pravilno zasnovano in izvedeno, zagotavlja uspešno izvedbo projekta. Kljub temu pa mu zaradi različnih razlogov pogosto ni namenjeno dovolj pozornosti. V diplomski nalogi je obravnavano terminsko planiranje pri projektu izgradnje polnega priključka na Celovško cesto. Najprej je bila predstavljena izdelava terminskega plana in njegove ažurirane različice, nato pa so bila obravnavana odstopanja med njima ter med ažurirano različico in trenutnim stanjem. Odstopanja so bila kategorizirana v tista, ki povzročajo zamude v delovnem procesu, ter tista, ki ne. Za vsako odstopanje je bil določen odgovoren deležnik. Rezultati so bili analizirani in predstavljeni glede na pogostost pojavljanja dejavnikov, pri čemer sta kot ključna dejavnika izstopala neustrezno terminsko planiranje in številne spremembe projekta. Ker neustrezno terminsko planiranje v tem primeru ni povzročilo zamud, so spremembe projekta predstavljale glavni vzrok za nastale zamude. V zaključku so bile predstavljene tudi potencialne rešitve za odpravo nastalih odstopanj.

Language:Slovenian
Keywords:diplomske naloge, gradbeništvo, terminski plan, dejavnost, odstopanje, zamuda, gantogram, mrežni plan
Work type:Bachelor thesis/paper
Typology:2.11 - Undergraduate Thesis
Organization:FGG - Faculty of Civil and Geodetic Engineering
Place of publishing:Ljubljana
Publisher:[K. Vidović]
Year:2025
Number of pages:1 spletni vir (6 datotek PDF (X, 45 str. + [10] str. pril.))
PID:20.500.12556/RUL-173777 This link opens in a new window
UDC:005.936.2:625.7/.8(497.4)(043.2)
COBISS.SI-ID:250444803 This link opens in a new window
Publication date in RUL:23.09.2025
Views:569
Downloads:336
Metadata:XML DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Analysis of deviations from the project schedule for the construction of full access to Celovška cesta : graduation thesis
Abstract:
Project scheduling, as a part of operational planning, is one of the key processes in construction operations. When properly designed and executed, it ensures the successful completion of a project. However, due to various reasons, it often does not receive the attention it deserves. This thesis addresses project scheduling in the construction of a full connection to Celovška cesta. First, the creation of the initial schedule and its updated version was presented, followed by an analysis of the deviations between them and between the updated version and the current status. The deviations were categorized into those that cause delays in the work process and those that do not. A responsible stakeholder was identified for each deviation. The results were analyzed and presented based on the frequency of occurrence of factors, with inadequate scheduling and numerous project changes standing out as the key factors. Since inadequate scheduling in this case did not cause delays, project changes were identified as the main cause of the delays. Finally, potential solutions for addressing the identified deviations were presented.

Keywords:graduation thesis, civil engineering, schedule, activity, deviation, delay, gantt chart, network schedule