For the past few years, we have been implementing the installation of slab track in Slovenia. This type of track requires precise stake-out or regulations, which require the use of special instrumentation, such as a dedicated measuring trolley. The subject of this graduation thesis is the use of the Amberg Rail GRP System FX measuring trolley for slab track regulation. Its use is presented on a 150 m long section of the Second Track Divača-Koper. The graduation thesis contains a detailed description of the Amberg Rail software, which was used throughout the process, from the planning phase of the measurements through to data processing. It also contains all methods of working with the trolley and a description of the dedicated measuring trolley. Special emphasis is placed on all phases of track regulation, which are an essential step for the correct installation of the slab track. This part also includes the technical specifications of the measuring equipment, as well as descriptions of the geodetic network and of the site where the regulation was carried out. The final part contains the measurement results and the track report, used to prove to the supervising engineer and to the client that the work was done in accordance with the project documentation.
|