Details

Pomen in gradnja Sabotinske ceste : diplomsko delo
ID Šušmelj, Jaka (Author), ID Repe, Božo (Mentor) More about this mentor... This link opens in a new window, ID Mikša, Peter (Comentor)

.pdfPDF - Presentation file, Download (1,56 MB)
MD5: 7D1B5FBE25AC56C2F8C74A3E88EDAFE5

Abstract
Diplomsko delo daje vpogled na zgodovinsko pomembnost Sabotinske ceste, ki je bila zgrajena sredi osemdesetih let dvajsetega stoletja po ozemlju Italije in Jugoslavije. Cesta je rešila prometno problematiko Goriških brd, ki so bila po koncu druge svetovne vojne nenadoma popolnoma izolirana. Zaradi razmejitve po drugi svetovni vojni, ki so jo določile zmagovalne sile druge svetovne vojne, so postala Brda skoraj popolnoma odrezana zaradi geografske blokade na vzhodu in varovane meje na zahodu. No voljo jim je ostala le ena cesta čez Vrhovlje, ki je bila zaradi svojih ovinkov in vzponov neprijetna in tudi dolgoročno neprimerna za razvoj Brd. Rešitev je bila izpeljana po diplomatski poti, ko sta Italija in Jugoslavija z Osimskimi sporazumi leta 1975 formalno potrdili potek svoje meje. Eden izmed glavnih sadov sporazumov je bila izgradnja Sabotinske ceste, ki sta jo financirali in gradili obe državi, vsaka na svojem ozemlju. Cesta je še danes v uporabi in še vedno velja za glavno prometno žilo, ki povezuje Novo Gorico z Brdi.

Language:Slovenian
Keywords:Sabotinska cesta, Osimski sporazumi, Goriška brda, zahodna slovenska meja
Work type:Bachelor thesis/paper
Typology:2.11 - Undergraduate Thesis
Organization:FF - Faculty of Arts
Place of publishing:Ljubljana
Publisher:J. Šušmelj
Year:2024
Number of pages:29 f.
PID:20.500.12556/RUL-170781 This link opens in a new window
UDC:94(497.4)"19"
COBISS.SI-ID:242730243 This link opens in a new window
Publication date in RUL:16.07.2025
Views:188
Downloads:40
Metadata:XML DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:The importance and the construction of the Sabotino road
Abstract:
The thesis gives an insight into the historical significance of the Sabotino road, which was built in the mid-1980s across the territory of Italy and Yugoslavia. The road solved the traffic problems of the Brda region (Gorizia Hills), which found itself almost completely isolated after the end of the Second World War. The post-World War II delimitation, drawn up by the victorious forces of the Second World War, left the Brda almost completely cut off by a geographical blockade to the east and a protected border to the west. They were left with only one road through Vrhovlje, which was both unpleasant and unsuitable for the development of Brda in the long term because of its sharp twists and steep climbs. The solution was found diplomatically when Italy and Yugoslavia formally confirmed the course of their border in the 1975 Treaty of Osimo. One of the main fruits of the treaty was the construction of the Sabotino road, which was financed and built by both signatory states, each responsible for the construction on its own territory. The road is still in use today and is still considered being the main transport artery linking Nova Gorica with Brda.

Keywords:Sabotino road, Treaty of Osimo, Brda, Western Slovenian Border

Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Back