izpis_h1_title_alt

Geodetska dela pri gradnji predora Vogršček : magistrsko delo št.: 162/II. GIG
ID Mustavar, Jan (Author), ID Urbančič, Tilen (Mentor) More about this mentor... This link opens in a new window, ID Koler, Božo (Mentor) More about this mentor... This link opens in a new window

.pdfPDF - Presentation file, Download (4,10 MB)
MD5: B774E7D7C4BF7271D94FB50F44BA1B57

Abstract
V magistrskem delu obravnavamo geodetska dela pri gradnji predora Vogršček v sklopu sanacije pregrade Vogršček. Geodetska dela so pri gradnji predora prisotna že pred začetkom gradnje z vzpostavitvijo geodetske mreže, ki služi kot osnova za izvajanje izmer in zakoličbenih del v predoru. Geodetska dela v predoru Vogršček so bila zakoličba projektirane osi predorske cevi, kontrola geometrije izkopa in primarne obloge, kontrolne meritve merskih profilov v predoru, zakoličba vodnih zapor in kontrola geometrije sekundarne obloge. Meritve in zakoličbena dela so bila izvedena z metodami klasične geodetske izmere in terestričnega laserskega skeniranja z uporabo primernega instrumentarija.

Language:Slovenian
Keywords:geodezija, magistrska dela, GIG, predor, geodetska dela, Vogršček, klasična terestrična izmera, TLS
Work type:Master's thesis/paper
Typology:2.09 - Master's Thesis
Organization:FGG - Faculty of Civil and Geodetic Engineering
Place of publishing:Ljubljana
Publisher:[J. Mustavar]
Year:2023
Number of pages:VIII, 37 str.
PID:20.500.12556/RUL-145699-dd39b589-cf41-11e3-cd43-e3cb960a6913 This link opens in a new window
UDC:528:624.19(497.4Vogršček)(043.3)
COBISS.SI-ID:151504387 This link opens in a new window
Publication date in RUL:10.05.2023
Views:500
Downloads:88
Metadata:XML RDF-CHPDL DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Geodetic works during construction of the tunnel Vogršček : master thesis no.: 162/II. GIG
Abstract:
This master thesis presents geodetic works during construction of tunnel Vogršček as part of remediation of dam Vogršček. Geodetic works during construction of tunnel are present even before start of excavation with establishment of geodetic network, which is used as a base for measurements and steaking-out in a tunnel. Geodetic works in tunnel Vogršček were steaking-out the axis of tunnel, control of excavation geometry and primary lining, tunnel monitoring, staking-out of waterstops and control of secondary lining geometry. Measurements and steaking-out works were done with classic terrestrial method and terrestrial laser scanning with using appropriate equipment.

Keywords:geodesy, master thesis, tunnel, geodetic works, Vogršček, classic terrestrial method, TLS

Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Back