Normiranje in terminiranje proizvodne linije
ID Bahor, Andraž (Author), ID Berlec, Tomaž (Mentor) More about this mentor... This link opens in a new window, ID Kušar, Janez (Comentor)

.pdfPDF - Presentation file, Download (9,02 MB)
MD5: 9C1EA983EA4005A26EAA5238880F1A7A

Abstract
Predmet obravnave v diplomski nalogi je normiranje proizvodnje. Tehnologi in strokovni delavci morajo določati časovne normative, ko načrtujejo delo v proizvodnji, za izdelavo natančnih kalkulacij in za nagrajevanje po učinku. V nalogi se osredotočamo na konkreten problem v podjetju, kjer zaenkrat časovni normativi operacij v proizvodnem procesu še niso vpeljani v redno prakso. Merili smo čase trajanja posameznih operacij na proizvodni liniji in identificirali ozka grla. Cilj naloge je postavitev norm in določanje rekonstrukcije organizacije proizvodnje, da bo le-ta čim učinkovitejša. Želimo ˇ doseči tudi terminiranje proizvodnje, za kar potrebujemo predhodno postavljene normative. Podrobno so predstavljene teoretične osnove normiranja in problem ozkega grla v proizvodnji. Rezultat naloge je nov načrt za delo na proizvodni liniji ter postavljeni normativi.

Language:Slovenian
Keywords:normiranje, terminiranje, proizvodnja, kritične kapacitete, ozka grla, norme
Work type:Bachelor thesis/paper
Typology:2.11 - Undergraduate Thesis
Organization:FS - Faculty of Mechanical Engineering
Place of publishing:Ljubljana
Publisher:[A. Bahor]
Year:2022
Number of pages:XXII, 45 str.
PID:20.500.12556/RUL-139503 This link opens in a new window
UDC:658.531:005.642.5(043.2)
COBISS.SI-ID:123431427 This link opens in a new window
Publication date in RUL:03.09.2022
Views:1299
Downloads:293
Metadata:XML DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Norming and termination of the production line
Abstract:
The subject of consideration in the diploma thesis is norming of the production line. Technologists must set time norms when planning work in production, to complete accurate calculations and to reward performance. In the assigment, we focus on a concrete problem in a company where time norms of operations have not yet been introduced into regular practice. We measured the duration of each operation on the production line and identified the bottleneck. The aim of the task is to establish a norm and determine the reconstruction of the organization of production, to make it as efficient as possible. We also want to achieve termination of the production line, for which we need a previously set norm. Theoretical bases of standardization and bottleneck problems in production are presented in detail. The result of the thesis is a new plan for work on the production line and set norms.

Keywords:norming, termination, production, critical capacity, bottleneck, norm