izpis_h1_title_alt

Idejni projekt ogrevalnih jam za slabe : diplomsko delo
ID Bobnar, Matic (Author), ID Kosec, Borut (Mentor) More about this mentor... This link opens in a new window, ID Rajaković, Bojan (Co-mentor)

.pdfPDF - Presentation file, Download (1,79 MB)
MD5: F6C9715A7CD62D9ACB27D15B8EBBBBE4

Abstract
Jeklene slabe moramo pred procesom vročega valjanja ogreti v potisni peči na temperaturo preoblikovanja, kar je drag in energetsko potraten proces. Z idejo, da bi privarčevali z zemeljskim plinom ter naredili vročo valjarno bolj učinkovito, bomo zasnovali ogrevalne jame, kjer bi slabe ogreli za približno 100 °C s pomočjo odpadnih dimnih plinov iz potisne peči in lastnih gorilnikov, kar bi občutno zmanjšalo porabo zemeljskega plina. V okviru dela bomo izbrali gradnike jam ter gradnike cevovoda. Izračunali bomo izgube toplote skozi stene in pokrove jam, izgube toplote dimnih plinov v cevovodu ter porabo zemeljskega plina, ki bi ohranjal zadostno temperaturo v jamah ter obenem istočasno ogreval slabe. Določili bomo potreben čas za ogrevanje slabov v jamah ter dimenzionirali dimnik za odvod dimnih plinov. Na podlagi izvedenih toplotnotehničnih izračunov bomo ovrednotili porabo zemeljskega plina glede na idejni projekt in jo primerjali s sedanjo porabo.

Language:Slovenian
Keywords:jeklo, slab, ogrevalne jame, potisna peč, idejni projekt, zemeljski plin
Work type:Bachelor thesis/paper
Typology:2.11 - Undergraduate Thesis
Organization:NTF - Faculty of Natural Sciences and Engineering
Place of publishing:Ljubljana
Publisher:[M. Bobnar]
Year:2022
Number of pages:XI, 31 f.
PID:20.500.12556/RUL-137806 This link opens in a new window
UDC:669
COBISS.SI-ID:129254915 This link opens in a new window
Publication date in RUL:01.07.2022
Views:645
Downloads:67
Metadata:XML RDF-CHPDL DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Preliminary project of heating caves for slabs : diploma work
Abstract:
Before the hot rolling process, the steel slabs must be heated in a pressure furnace to the transformation temperature, which is an expensive and energy consuming process. With the idea of saving on natural gas and making the hot rolling mill more efficient, we have designed heating pits in which the slabs would be heated with natural gases from the pusher furnace and own burners by about 100 °C, which would significantly reduce natural gas consumption. As part of the work, we selected the building elements of the caves and the building elements of the pipeline. We calculated heat losses through the walls and covers of the caves, heat losses of the flue gases in the pipeline and the consumption of natural gas, which would maintain a sufficient temperature in the caves and at the same time heat the slabs. We determined the time required for heating the slabs in the pits and dimensioned the flue for natural gas discharge. Based on thermo-technical calculations, we will evaluate the consumption of natural gas according to preliminary project and compare it with current.

Keywords:steel, slab, heating caves, pusher furnace, preliminary project, natural gas

Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Back