Your browser does not allow JavaScript!
JavaScript is necessary for the proper functioning of this website. Please enable JavaScript or use a modern browser.
Repository of the University of Ljubljana
Open Science Slovenia
Open Science
DiKUL
slv
|
eng
Search
Advanced
New in RUL
About RUL
In numbers
Help
Sign in
Details
Parsimonious process model of energy retrofit of buildings
ID
Turk, Žiga
(
Author
),
ID
Ma, Zhiliang
(
Author
),
ID
Klinc, Robert
(
Author
)
PDF - Presentation file,
Download
(708,48 KB)
MD5: 5ED0608C5147090F9FC4F35131754881
URL - Source URL, Visit
https://www.sciendo.com/article/10.2478/otmcj-2022-0007
Image galllery
Abstract
Building information modelling (BIM) technology has been focusing on the creation, sharing and use of a comprehensive digital twin of the facility under construction or renovation. It is believed that a more comprehensive, structured and complete model would be better. The aim of this paper and the underlying research is to reaffirm the view that the essence of information is to inform the user and that the main purpose of information models is that they are informative – that they contain the necessary information. Parsimonious information is information that is necessary but as simple as possible. Our hypothesis is that in many cases simpler models could be more useful, as they do not introduce technological barriers with the usually involved low- and medium-level contractors. One such case is the energy retrofitting of existing buildings. Many public and residential buildings with poor energy performance are located all over the world, especially in Eastern and Central Europe, as well as in China. They are an efficient target for a significant improvement in their energy performance by improving the building envelope and openings. The paper presents an economical process model for the modernisation of existing buildings. This model provides a basis for a parsimonious product model, which is currently under development. The broader objective of the research presented is to examine cases where a heavy information model may not be necessary and where a detailed process definition – as described in the BIM implementation plan and related documents – would lead to over-specification that would limit the free dynamics of a workflow.
Language:
English
Keywords:
information management
,
digital twin
,
building information modelling
,
energy retrofitting
Work type:
Article
Typology:
1.01 - Original Scientific Article
Organization:
FGG - Faculty of Civil and Geodetic Engineering
Publication status:
Published
Publication version:
Version of Record
Year:
2022
Number of pages:
Str. 2631-2639
Numbering:
Vol. 14, iss. 1
PID:
20.500.12556/RUL-137059
UDC:
004:69
ISSN on article:
1847-6228
DOI:
10.2478/otmcj-2022-0007
COBISS.SI-ID:
108785411
Publication date in RUL:
31.05.2022
Views:
1514
Downloads:
175
Metadata:
Cite this work
Plain text
BibTeX
EndNote XML
EndNote/Refer
RIS
ABNT
ACM Ref
AMA
APA
Chicago 17th Author-Date
Harvard
IEEE
ISO 690
MLA
Vancouver
:
Copy citation
Share:
Record is a part of a journal
Title:
Organization, technology & management in construction
Shortened title:
Organ. technol. manag. constr.
Publisher:
Sciendo, University of Zagreb, Faculty of Civil Engineering
ISSN:
1847-6228
COBISS.SI-ID:
518848537
Licences
License:
CC BY 4.0, Creative Commons Attribution 4.0 International
Link:
http://creativecommons.org/licenses/by/4.0/
Description:
This is the standard Creative Commons license that gives others maximum freedom to do what they want with the work as long as they credit the author.
Secondary language
Language:
Slovenian
Keywords:
upravljanje informacij
,
digitalni dvojček
,
informacijsko modeliranje stavb
,
energetska prenova
Projects
Funder:
ARRS - Slovenian Research Agency
Project number:
BI-CN/18-20-2018
Funder:
ARRS - Slovenian Research Agency
Project number:
P2-0210
Name:
E-gradbeništvo
Similar documents
Similar works from RUL:
Similar works from other Slovenian collections:
Back