Optimizacija izrabe razpoložljivosti strojev
ID Černač, Tine (Author), ID Kušar, Janez (Mentor) More about this mentor... This link opens in a new window, ID Berlec, Tomaž (Comentor)

.pdfPDF - Presentation file, Download (5,40 MB)
MD5: C1DE5420BD29A2A2C4CEEED6987E8BFC
.pdfPDF - Appendix, Download (488,06 KB)
MD5: 73DA22C9038EFDF50AEA3C4181A7B4AA
.pdfPDF - Appendix, Download (507,73 KB)
MD5: D8A7ECF465B4BCEA4BE6570CDFAFAAF3
This document has even more files. Complete list of files is available below.

Abstract
Na obravnavanem primeru treh ekscentričnih stiskalnic smo izvedli SMED metodo z namenom hitrejšega postopka menjave orodja. Najprej smo stiskalnice dva meseca analizirali in beležili njihovo učinkovitost ter izkoriščenost. Beležili smo ure delovanja, ure zastojev ter ure menjav orodij. Glede na izsledke analize smo na oddelku opravili SMED delavnico ter predlagali rešitve za skrajšanje časa menjave orodja. Ocenili smo okviren prihranek časa ter velikost investicije za implementacijo vseh rešitev. Poleg tega smo analizirali še vzroke za zastoje med delovanjem ter vzroke za nerazpoložljivost predmetov dela. Vsem možnim vzrokom smo predlagali ukrepe za omejitev oz. eliminacijo.

Language:Slovenian
Keywords:proizvodni proces, kapaciteta, učinkovitost, SMED, 5S, optimizacija
Work type:Master's thesis/paper
Typology:2.09 - Master's Thesis
Organization:FS - Faculty of Mechanical Engineering
Place of publishing:Ljubljana
Publisher:[T. Černač]
Year:2022
Number of pages:XX, 66 str.
PID:20.500.12556/RUL-137013 This link opens in a new window
UDC:658.5.018.2:621.9(043.2)
COBISS.SI-ID:109702403 This link opens in a new window
Publication date in RUL:28.05.2022
Views:933
Downloads:159
Metadata:XML RDF-CHPDL DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Machine availability optimization
Abstract:
We conducted the Single-Minute Exchange of Die (SMED) method on eccentric presses to reduce setup times between tool changeovers. First, we analyzed the presses for two months and collected efficiency and utilization data such as working hours, breakdown hours, and setup hours. Based on the analysis, we arranged a SMED workshop on the production floor, analyzed tool changeover processes, and prepared a list of solutions to reduce the setup time. We assessed time reduction and calculated the investment amount to implement all solutions. Furthermore, we analyzed causes for breakdowns and other stoppages during operation. For those, we prepared a further list of measures to avoid or eliminate such problems in the future.

Keywords:production process, capacity, efficiency, SMED, 5S, optimization