Your browser does not allow JavaScript!
JavaScript is necessary for the proper functioning of this website. Please enable JavaScript or use a modern browser.
Repository of the University of Ljubljana
Open Science Slovenia
Open Science
DiKUL
slv
|
eng
Search
Browse
New in RUL
About RUL
In numbers
Help
Sign in
Details
Načrtovanje časovnega poteka obnove poslovne stavbe : magistrsko delo
ID
Fajdiga, Bojan
(
Author
),
ID
Šelih, Jana
(
Mentor
)
More about this mentor...
,
ID
Srdič, Aleksander
(
Comentor
)
PDF - Presentation file,
Download
(4,89 MB)
MD5: A5CB2A386B0142854F917A37CDC1FF7D
PDF - Appendix,
Download
(19,60 MB)
MD5: F027729356F417FD6F3D573C335F3AF3
Image galllery
Abstract
Magistrsko delo obravnava načrtovanje in optimizacijo časa za obnovo upravne stavbe AD MEPSO. Lokacija objekta se nahaja v središču mesta Skopje (R. S. Makedonija). Prenova se izvaja z namenom izboljšanja energetske učinkovitosti objekta v skladu z zahtevami iz strategije Evropa 2020. V prvem, teoretičnem delu je prikazana podrobna analiza in primerjava zakonov, ki so relevantni za gradnjo gradbenih objektov v Republiki Sloveniji in Republiki S. Makedoniji. V drugem, praktičnem delu, smo pripravili projekt organizacije obnove stavbe. Podani so popolni tehnični podatki in risbe obstoječega ter novoustanovljenega stanja stavbe. Posebna pozornost je namenjena izbiri in preizkušanju gradbenih materialov, ki bodo uporabljeni za gradnjo. Nadalje smo pripravili časovni načrt poteka izvedbe in razvili ter analizirali dve varianti. Prva varianta je načrtovana tako, da se objekt izvede v dveh fazah, v drugi varianti se prenova objekta naredi v celoti oziroma naenkrat. Po podrobni analizi in primerjavi obeh možnosti je bila izbrana najprimernejša varianta z vidika investitorja, ki smo jo dodatno optimizirali. S tem bistveno skrajšamo skupni čas gradnje, ki je potreben za obnovo obravnavanega objekta.
Language:
Slovenian
Keywords:
stavba
,
optimizacija
,
terminski plan
,
obnova
,
gradbeno dovoljenje
,
kakovost materiala
,
aktivnosti
,
načrtovanje
Work type:
Master's thesis/paper
Typology:
2.09 - Master's Thesis
Organization:
FGG - Faculty of Civil and Geodetic Engineering
Publisher:
[B. Fajdiga]
Year:
2020
PID:
20.500.12556/RUL-115357
UDC:
658.513.4:69.059.25:725(043.3)
COBISS.SI-ID:
20362499
Publication date in RUL:
24.04.2020
Views:
3080
Downloads:
390
Metadata:
Cite this work
Plain text
BibTeX
EndNote XML
EndNote/Refer
RIS
ABNT
ACM Ref
AMA
APA
Chicago 17th Author-Date
Harvard
IEEE
ISO 690
MLA
Vancouver
:
FAJDIGA, Bojan, 2020,
Načrtovanje časovnega poteka obnove poslovne stavbe : magistrsko delo
[online]. Master’s thesis. B. Fajdiga. [Accessed 25 March 2025]. Retrieved from: https://repozitorij.uni-lj.si/IzpisGradiva.php?lang=eng&id=115357
Copy citation
Share:
Secondary language
Language:
English
Title:
Planning a time schedule for renovation of an administrative building : master thesis
Abstract:
The master's thesis deals with the planning and time optimization for reconstruction of the AD MEPSO administrative building. The building is located in the center of Skopje (R.N Macedonia). The reconstruction is carried out in order to improve the energy efficiency of the building in accordance with the requirements of the Europe 2020 strategy. In the second, practical part, we prepared the project for organization of the reconstruction of the building. Complete technical data and drawings of the existing and newly established condition of the building are given. Special attention is paid to the selection and testing of building materials which will be used for the reconstruction of the building. Furthermore, we prepared a timetable for implementation and two options were developed and analyzed. The first option foresees the reconstruction to be done in two phases, while the second option foresees the renovation to be done in full i.e. in one phase. After a detailed analysis and comparison of the two options, the most suitable option was selected from the investor's perspective, which we further optimized. This significantly shortens the total time required for reconstruction of the object.
Keywords:
building
,
optimization
,
time schedule
,
renovation
,
building permit
,
material quality
,
activities
,
planning
Similar documents
Similar works from RUL:
Numerično modeliranje viskoelastičnih materialov
Modelling the mechanical response of two-layered artery using thermomechanical analogy approach
Numerical modelling of geometrically nonlinear mechanical response of a micro-switch
Analysis of geometric simplifications in determining the mechanical response of a pipe in contact with support
Prilagodljivo modeliranje ploskovnih konstrukcij
Similar works from other Slovenian collections:
Software for earthquake load dispose on elastic construction frame
SAP2000
Konstruiranje nadgradnje gasilskega vozila
Comparison and implementation of thermo-mechanical fatigue damage models
AlfaCAD
Back