Načrtovanje časovnega poteka obnove poslovne stavbe : magistrsko delo
ID Fajdiga, Bojan (Author), ID Šelih, Jana (Mentor) More about this mentor... This link opens in a new window, ID Srdič, Aleksander (Co-mentor)

.pdfPDF - Presentation file, Download (4,89 MB)
MD5: A5CB2A386B0142854F917A37CDC1FF7D
.pdfPDF - Appendix, Download (19,60 MB)
MD5: F027729356F417FD6F3D573C335F3AF3

Abstract
Magistrsko delo obravnava načrtovanje in optimizacijo časa za obnovo upravne stavbe AD MEPSO. Lokacija objekta se nahaja v središču mesta Skopje (R. S. Makedonija). Prenova se izvaja z namenom izboljšanja energetske učinkovitosti objekta v skladu z zahtevami iz strategije Evropa 2020. V prvem, teoretičnem delu je prikazana podrobna analiza in primerjava zakonov, ki so relevantni za gradnjo gradbenih objektov v Republiki Sloveniji in Republiki S. Makedoniji. V drugem, praktičnem delu, smo pripravili projekt organizacije obnove stavbe. Podani so popolni tehnični podatki in risbe obstoječega ter novoustanovljenega stanja stavbe. Posebna pozornost je namenjena izbiri in preizkušanju gradbenih materialov, ki bodo uporabljeni za gradnjo. Nadalje smo pripravili časovni načrt poteka izvedbe in razvili ter analizirali dve varianti. Prva varianta je načrtovana tako, da se objekt izvede v dveh fazah, v drugi varianti se prenova objekta naredi v celoti oziroma naenkrat. Po podrobni analizi in primerjavi obeh možnosti je bila izbrana najprimernejša varianta z vidika investitorja, ki smo jo dodatno optimizirali. S tem bistveno skrajšamo skupni čas gradnje, ki je potreben za obnovo obravnavanega objekta.

Language:Slovenian
Keywords:stavba, optimizacija, terminski plan, obnova, gradbeno dovoljenje, kakovost materiala, aktivnosti, načrtovanje
Work type:Master's thesis/paper
Typology:2.09 - Master's Thesis
Organization:FGG - Faculty of Civil and Geodetic Engineering
Publisher:[B. Fajdiga]
Year:2020
PID:20.500.12556/RUL-115357 This link opens in a new window
UDC:658.513.4:69.059.25:725(043.3)
COBISS.SI-ID:20362499 This link opens in a new window
Publication date in RUL:24.04.2020
Views:2153
Downloads:331
Metadata:XML RDF-CHPDL DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Planning a time schedule for renovation of an administrative building : master thesis
Abstract:
The master's thesis deals with the planning and time optimization for reconstruction of the AD MEPSO administrative building. The building is located in the center of Skopje (R.N Macedonia). The reconstruction is carried out in order to improve the energy efficiency of the building in accordance with the requirements of the Europe 2020 strategy. In the second, practical part, we prepared the project for organization of the reconstruction of the building. Complete technical data and drawings of the existing and newly established condition of the building are given. Special attention is paid to the selection and testing of building materials which will be used for the reconstruction of the building. Furthermore, we prepared a timetable for implementation and two options were developed and analyzed. The first option foresees the reconstruction to be done in two phases, while the second option foresees the renovation to be done in full i.e. in one phase. After a detailed analysis and comparison of the two options, the most suitable option was selected from the investor's perspective, which we further optimized. This significantly shortens the total time required for reconstruction of the object.

Keywords:building, optimization, time schedule, renovation, building permit, material quality, activities, planning