izpis_h1_title_alt

Protipožarne preseke na območju južne Primorske : magistrsko delo - 2. stopnja
ID Saražin, Jaša (Author), ID Poje, Anton (Co-mentor), ID Potočnik, Igor (Mentor) More about this mentor... This link opens in a new window

.pdfPDF - Presentation file, Download (7,86 MB)
MD5: 5DE7D13D685341177B74F7361015AB5A

Abstract
V magistrski nalogi je celostno prikazana tematika protipožarnih presek, od analize prometnega omrežja, pa do projekta nove protipožarne preseke. Najprej je bilo analizirano celotno prometno omrežje, z namenom zagotavljanja protipožarne varnosti na območju raziskave. To območje je zajemalo del požarno ogrožene površine Južne Primorske na površini 47.936 ha. Rezultati dobljeni iz v naprej pridobljenega kartnega materiala so bili korigirani upoštevajoč nove podatke, ki so bili pridobljeni s terenskim vzorčenjem. Upoštevajoč zgolj kartni material, je relativna odprtost območja znašal 63 %, kar se smatra kot nezadostno. Zadovoljiva odprtost (80 %) je bila dosežena šele z upoštevanjem korigiranih vrednosti. Težava dodatno posnetih prometnic se pa je pokazala v temu, da so le te slabše umeščene v prostor za potrebe protipožarnega varstva. Pri preverjanju kartnega materiala, z vidika prevoznosti posameznih kategorij prometnic za namenska vozila, se je izkazalo, da je zgolj na podlagi kartnega materiala težko optimalno razporediti namenska vozila po prostoru. Za zadovoljivo mejo je bila postavljena 95 % možnost dostopa. Javne ceste so lahko zagotovile dostop vsem vozilom v 90 % primerov, protipožarne preseke I kategorije vsem svojim namenskim vozilom v 82 %, medtem ko protipožarne preseke II kategorije vsem svojim namenskim vozilom v 92 %. Po drugi strani pa so bile nižje kategorizirane prometnice pogosto zmožne sprejeti večja vozila, kar je prav tako moteče pri racionalnem odločanju. V nadaljevanju je bilo izpostavljeno eno prednostno območje odpiranja ter v njem načrtovani dve varianti novih protipožarnih presek. Na podlagi večkriterialnega primerjanja je bila izbrana boljša varianta in izdelan projekt za izgradnjo njenega dela v dolžini 1417 m. Izbrana varianta odpira 25,81 ha do sedaj neodprtih površin ter izboljšuje relativno odprtost prednostnega območja za večja namenska vozila iz 7,9 % na 30,8 %.

Language:Slovenian
Keywords:protipožarne preseke, gozdne ceste, projektiranje, načrtovanje, cestno omrežje, gozdni požari
Work type:Master's thesis/paper
Typology:2.09 - Master's Thesis
Organization:BF - Biotechnical Faculty
Place of publishing:Ljubljana
Publisher:[J. Saražin]
Year:2014
Number of pages:87 str., [14] f. pril.
PID:20.500.12556/RUL-115289 This link opens in a new window
UDC:630*68:630*43(043.2)=163.6
COBISS.SI-ID:3907750 This link opens in a new window
Publication date in RUL:22.04.2020
Views:926
Downloads:164
Metadata:XML RDF-CHPDL DC-XML DC-RDF
:
Copy citation
Share:Bookmark and Share

Secondary language

Language:English
Title:Fire preventions roads in area of south Primorska
Abstract:
In this master thesis is fully presented fire prevention roads topic; from its road network analyses, till project of the new fire prevention road. Firstly whole road network, which can be used for fire prevention purpose in our research area was analyzed. This area covers a part of fire endangered land of South Primorska on total area of 47.936 ha. Results obtained from official map material were corrected with new data, obtained with field work. Considerating only official map material gave us insufficient relative openness (63 %) of the area. While considering corrected values, with non mapped roads, relative openness appeared to be satisfactory (80 %). The highlighted problem of additionally digitalized roads was that those were much worse placed in area for fire prevention purpose. Secondly the transportability of categories in map material for groups of assigned vehicles were checked. Results appeared, while relating only on official map material, vehicles can%t be optimally located around the area. 95 % transportability was set as sufficient. Public roads could provide approach to all vehicles in 90 %, fire prevention roads of category I to all of their assigned vehicles in 82 %, fire prevention roads of category II to all of their assigned vehicles in 92 %. On the other hand, lower categorized roads were often able to provide access to bigger vehicles, which also presents a distraction while undertaking rational decisions. At the end one priority area of opening was focused and there we planned two variants of new fire prevention roads. On base of multi-criteria comparison, decision for better variant was made and a project for its construction in total length of 1417 m prepared. Chosen variant opens 25,81 ha of closed areas and it improves relative openness of priority area for bigger assigned vehicles from 7,9 % to 30,8 %.


Similar documents

Similar works from RUL:
Similar works from other Slovenian collections:

Back